Sevket Yilmaz
Angestellt, Production Systems Manager, Kale Lock and Mold Inc. Co.
Istanbul, Türkei
Suchst Du einen anderen Sevket Yilmaz?
Werdegang
Berufserfahrung von Sevket Yilmaz
Bis heute 3 Jahre und 7 Monate, seit Dez. 2020
Production Systems Manager
Kale Lock and Mold Inc. Co.
2 Jahre und 5 Monate, Aug. 2018 - Dez. 2020
Senior Expert of Investment Projects & i4.0
Kale Lock & Mold Ind. Co. Inc.
• Managed and commissioned of New Paintshop Project (Powder Coating) • Realized and managing robotic automation projects which is gaining 30+ headcount in 2020 • Managing new lock assembly line robotic automation project ( 12 Headcounts reduction and %30 capacity increasing),1st step of humanless assembly line, this project is defined as a milestone of the company. • Managing new OEE tracking project which realises machine learning and predictive maintenance activities on existing AA machines
3 Jahre und 8 Monate, Jan. 2015 - Aug. 2018
Technical Planning Expert
B/S/H/ Home Appliances
• As direct report to Head of Technical Planning Section. • Performed 3 Extrusion Lines capacity check/control to fit the strategic direction of the factory. Within this period, i realized 1 new extrusion line investment in the year of 2016. (2 mio €). • Performed 26 Injection moulding machines capacity check/control to fit the strategic direction of the factory. Withnin this period, i realized 5 (FRFI1) + 1 (FRFI2) new IMMs investment in the year of 2015. (~3 mio €)
3 Jahre und 11 Monate, März 2011 - Jan. 2015
Technical Planning Engineer
B/S/H/ Home Appliances
• Accomplished of 6 Sigma Green Belt project to avoid the capacity bottleneck on existing extrusion line with 40% capacity increase rate. As a result of this, new machinery investment decision was cancelled which was forecasted in Business Plan as 1.2 mio €. • Realized a modification project at common sheet extrusion line to produce sheet + coil on the same line. (Priority-1 project because of Business continuity management for 2 main factory)
1 Jahr und 3 Monate, Jan. 2010 - März 2011
Production Engineer
Hema Industry
• As direct report to Hydraulic Pump Factory Production Chief. • Managed of serial production activities. • Realized avoiding waste projects on hydraulic pump production • Integrated the CAM program usage to decrease the machining time of CNC machines. • Led of new technology assembly line for hydraulic pump assembling.
3 Jahre und 4 Monate, Sep. 2006 - Dez. 2009
Self Employed
Yilmazlar Natural Gas
• Realized natural gas piping projects for domestic and industrial usage • Managed all of supply chain, production and projects activities • Coordinated of customer relations and financial activities • Created water piping, heating projects • Created lifting equipment projects
Ausbildung von Sevket Yilmaz
3 Jahre und 10 Monate, Sep. 2002 - Juni 2006
Mechanical Engineering
Balıkesir University
Sprachen
Deutsch
Grundlagen
Englisch
Fließend
Türkisch
Muttersprache