Sevket Yilmaz

Angestellt, Production Systems Manager, Kale Lock and Mold Inc. Co.

Istanbul, Türkei

Fähigkeiten und Kenntnisse

Project management
Process Improvement
Make or Buy Analysis
Process Automation
Injection molding
Manufacturing engineering
Extrusion
Team Management
team work
Team leadership
Health Safety Environment HSE
Energy efficiency
Hot Stamping
Pad printing
Printing Technology
Project Procurement
Project
Engineering
Lean Production
Robotics

Werdegang

Berufserfahrung von Sevket Yilmaz

  • Bis heute 3 Jahre und 7 Monate, seit Dez. 2020

    Production Systems Manager

    Kale Lock and Mold Inc. Co.

  • 2 Jahre und 5 Monate, Aug. 2018 - Dez. 2020

    Senior Expert of Investment Projects & i4.0

    Kale Lock & Mold Ind. Co. Inc.

    • Managed and commissioned of New Paintshop Project (Powder Coating) • Realized and managing robotic automation projects which is gaining 30+ headcount in 2020 • Managing new lock assembly line robotic automation project ( 12 Headcounts reduction and %30 capacity increasing),1st step of humanless assembly line, this project is defined as a milestone of the company. • Managing new OEE tracking project which realises machine learning and predictive maintenance activities on existing AA machines

  • 3 Jahre und 8 Monate, Jan. 2015 - Aug. 2018

    Technical Planning Expert

    B/S/H/ Home Appliances

    • As direct report to Head of Technical Planning Section. • Performed 3 Extrusion Lines capacity check/control to fit the strategic direction of the factory. Within this period, i realized 1 new extrusion line investment in the year of 2016. (2 mio €). • Performed 26 Injection moulding machines capacity check/control to fit the strategic direction of the factory. Withnin this period, i realized 5 (FRFI1) + 1 (FRFI2) new IMMs investment in the year of 2015. (~3 mio €)

  • 3 Jahre und 11 Monate, März 2011 - Jan. 2015

    Technical Planning Engineer

    B/S/H/ Home Appliances

    • Accomplished of 6 Sigma Green Belt project to avoid the capacity bottleneck on existing extrusion line with 40% capacity increase rate. As a result of this, new machinery investment decision was cancelled which was forecasted in Business Plan as 1.2 mio €. • Realized a modification project at common sheet extrusion line to produce sheet + coil on the same line. (Priority-1 project because of Business continuity management for 2 main factory)

  • 1 Jahr und 3 Monate, Jan. 2010 - März 2011

    Production Engineer

    Hema Industry

    • As direct report to Hydraulic Pump Factory Production Chief. • Managed of serial production activities. • Realized avoiding waste projects on hydraulic pump production • Integrated the CAM program usage to decrease the machining time of CNC machines. • Led of new technology assembly line for hydraulic pump assembling.

  • 3 Jahre und 4 Monate, Sep. 2006 - Dez. 2009

    Self Employed

    Yilmazlar Natural Gas

    • Realized natural gas piping projects for domestic and industrial usage • Managed all of supply chain, production and projects activities • Coordinated of customer relations and financial activities • Created water piping, heating projects • Created lifting equipment projects

Ausbildung von Sevket Yilmaz

  • 3 Jahre und 10 Monate, Sep. 2002 - Juni 2006

    Mechanical Engineering

    Balıkesir University

Sprachen

  • Deutsch

    Grundlagen

  • Englisch

    Fließend

  • Türkisch

    Muttersprache

21 Mio. XING Mitglieder, von A bis Z