Ing. Alberto Q. Gomez

Bis 2014, Consultant, DYD Management

Brattvag, Norwegen

Fähigkeiten und Kenntnisse

Problem Solving
Customer Focus
Planning
Budgeting
Team Leadership
Improvement
ERP
Knowledge
Management
Lean Manufacturing
Operations
Optimization
Outsourcing
Quality
Risk Management
Critical Thinking
Discreet
Operations Management
Business Statistics

Werdegang

Berufserfahrung von Alberto Q. Gomez

  • Bis heute 6 Jahre und 4 Monate, seit Feb. 2018

    consultor

    none

    § Assist with large projects that are focused on the Latino community translation and understanding their culture limitations, and providing advise. § Trading food between manufacturers and supermarkets.

  • 3 Jahre und 6 Monate, Aug. 2013 - Jan. 2017

    Project Manager

    Rolls-Royce

    Managing and leading the introduction of new hydraulic product to the production line .Working with cross-functional teams (Engineering, Purchasing, Operations, etc) to achieve the most cost efficiency for manufacturing and comply with HSE regulations.Develop technical, maintenance and quality assurance docs. for the product and using LEAN-sigma techniques Define the investment for the product, develop and execute the CAPEX Reporting to stakeholders, sponsor and managers.Budget responsibility: 2,2 MNok

  • 3 Jahre und 7 Monate, Feb. 2011 - Aug. 2014

    Consultant

    DYD Management

  • 7 Monate, Dez. 2011 - Juni 2012

    Sr. Manufacturing Engineer

    Alconza

    § Responsible for optimizing layout and production processes (through LEAN) in the areas of packaging, presses and machining. § Identification, definition and presentation of investment needs for the areas. § Definition and design the tools for manufacturing. Discrepancies report management, work instructions development. § Managing logistics, suppliers and subcontractors for the manufacturing line. § Budget responsibility: 100k euros

  • 2008 - 2011

    Quality Engineer Manager

    GES USA

    § Conceptualized and implemented procedures and technical specifications system for maintenance, assembly, and construction of wind turbines. § Ensured consistent high-performance quality by conducting thorough audits reducing the customer complaints 30% and increase the confidence of customer. § Set up and implement a plan to increase the productivity of the techs and the availability of the wind farm as well. During the firsts months the availability of the wind farm went from 95% to 99%.

  • 2006 - 2008

    Project Manager

    GES SIEMSA

    § Directed contractual verification of power curve of winds turbine for Gamesa S.A. on new installed wind farms, avoiding to pay millions of $ on penalties base on non fulfillment of contract. § Managed human resources, materials, and purchases to carry out the projects on time and inside of budget. § Management, analysis and resolution of a vast array of problems that occur during verification giving as result improvements in the machine.

  • 2004 - 2006

    Manufacturing Headers Manager

    GEA IBERICA

    § Managed and supervised 40-person team; set high standards and met objectives. § Organized and planned manufacturing process including production, welding, machining, assembly, calibrations, and subcontracting. § Oversaw all manufacturing activities; ensured compliance with customer’s standards. § Improved machining and welding processes through researching and resolving problems during manufacturing, resulting in increased operational efficiency and effectiveness of 20%. § Cost reduction of 50% on ma

  • 2002 - 2004

    Project Manager

    ITP

    § Provided technical support for product detection and design; purchased tools for manufacturing. § Managed subcontractor operations, including searches, requests, and quotes. § Development of Manufacturing Engineer department, establishing the procedures for ISO 9001 and EN9100 and getting the approvals to keep the workload. § Develop of documentation for special process (aluminum welding, painting and N.D.T.) and getting quality approvals. Being included in their supplier list for new projects. § Leadi

  • 1996 - 2002

    Peon Especialista

    MEAD

    § Ensured proper maintenance and cleaning of off-set printers and other machinery. § Performed preventive maintenance on all machines including compressors, pumps, air conditioning, and off-set machines.

Ausbildung von Alberto Q. Gomez

  • 1 Monat, Juli 2007 - Juli 2007

    International Executive Program

    Georgetown University - The McDonough School of Business

  • 1 Jahr und 4 Monate, Sep. 2006 - Dez. 2007

    MBA

    ESEUNE

  • 5 Jahre und 1 Monat, Sep. 1996 - Sep. 2001

    B.S Engineer, Industrial Engineer

    Universidad del País Vasco/Euskal Herriko Unibertsitatea

Sprachen

  • Spanisch

    Muttersprache

  • Englisch

    Fließend

  • Deutsch

    Grundlagen

  • Norwegisch

    Grundlagen

Interessen

sports
language
investments
computer
photography

21 Mio. XING Mitglieder, von A bis Z