Alexander Kammerer
Angestellt, Director Project Management, FAM GmbH
Abschluss: Mechatronics, JKU Linz
Braunschweig, Deutschland
Über mich
PMP, project management professional with more than 20 years of experience in construction, projects and operations in the Caribbean, Brazil, Mexico and Europe where I gained vast experience in petrochemical, Oil/Gas, steel making, glass industry, sugar industry and now mining. My strengths are analyzing and delivering projects/tasks at all stages from the planning and engineering, procurement assistance, to the installation, commissioning and close-out inclusive of dispute settlement. I am an inspirational leader who not only had the opportunity to apply analytical thinking and experience in projects, more so also in strategical workstreams and operations.
Werdegang
Berufserfahrung von Alexander Kammerer
BEUMER Group, Beckum acquired FAM GmbH in June 2022. Expanded product range including systems for mining, conveying, storage, crushing, homogenizing and loading of minerals, raw materials and goods as well as a range of large-scale equipment and individual machines such as bucket wheel excavators, stacker, reclaimer, ship loaders and crushers for open-cast mines and power plants, metallurgy, the cement industry, the building materials industry, the chemical and fertilizer industry and port handling.
Main responsibilities within the first 12 months were focused on strategic objectives such as but not limited to Design-to-Cost approaches for projects and products to close the gap between targeting costs and actual costs; company strategies to enhance global project management as well as co-author of a global Project Management Manual. Beside those strategic tasks the responsibility for an EPCM Project in Serbia, a stacker reclaimer with tripper was assumed mid-2021 under constrained time schedule.
5 Jahre und 9 Monate, Jan. 2015 - Sep. 2020
Senior Project Manager
ak Engenharia e Projetos
Senior Project Manager @ greenfield factory, Middle East 10/2018 – 09/2020 - BMA AG Site Manager @ NAFIS/Iran 08/2018 – 09/2018 - HEYE International GmbH Consultant @ SIVESA/Veracruz, Mexico 02/2018 – 09/2018 - HORN Glass Industries AG Site Manager @ VICHISA/Chihuahua, Mexico 10/2017 – 01/2018 - HEYE International GmbH Country Manager Brazil 01/2017 – 09/2018 - LWN do BRASIL and PNEUMOFORE Site Manager @ AMBEV/Rio de Janeiro, Brazil 04/2015 – 12/2016 - HEYE International GmbH
9 Monate, Feb. 2014 - Okt. 2014
General Manager (Steel Making)
ThyssenKrupp CSA
Central Maintenance, Engineering & Infrastructure RIo de Janeiro - Brazil Responsible for management and coordination of the centralized maintenance of the Steel Complex pursuing the best technical/economical solution optimizing the resources in the whole Complex. Additional, being responsible for the Capital Expenditures projects implementation to support a sustainable growth of the company for a competitive environment of technology and cost effective operation. CAPEX 190mn US p.a. and OPEX 250mn US p.a.
1 Jahr und 9 Monate, Mai 2012 - Jan. 2014
Head of Engineering (Steel Making)
ThyssenKrupp CSA
Plant Engineering and Infrastructure Rio de Janeiro - Brazil Management of the Plant Engineering department, responsible to develop and later to implement CAPEX projects (190mn US$/year). Integration of technical solutions and supporting the individual production areas in improving plant performance and reliability.
1 Jahr und 7 Monate, Okt. 2010 - Apr. 2012
Construction Manager (Steel Making)
ThyssenKrupp CSA
Coking Plant (CCP) Rio de Janeiro - Brazil Erection and commissioning of two (2) Heat-Recovery Coking Batteries with steam boilers and FGD (Flue Gas Desulfurization). Involvement in purchase, commercial and dispute management. Investment volume 250mn EUR/Battery.
1 Jahr und 5 Monate, Mai 2009 - Sep. 2010
Head of Department (Steel Making)
ThyssenKrupp CSA
Steel Making Plant (SMP) Rio de Janeiro - Brazil Installation, pressure testing and commissioning of all media systems in BOF steel plant. Involvement in engineering, purchase, commercial and claim management.
2 Jahre, Mai 2007 - Apr. 2009
Senior Project Manager (Oil/Gas)
Carillion
NHT & CCR platformer project at Petrotrin Refinery Trinidad and Tobago, WI Senior Project Manager for the erection of two(2) substation buildings, instrument rack room, compressor shelter, civil RC foundations; process piping fabrication, installation and testing; and site painting of equipment and piping for the NHT & CCR Platformer Complex Project engineered by Samsung Engineering, Korea. Quantity survey, claims resolution and mitigation. Client: Samsung Engineering.
2 Monate, März 2007 - Apr. 2007
Project Manager (Oil/Gas)
Carillion
PPGPL Gas Processing plant expansion III Trinidad and Tobago, WI Project Manager responsible for site preparation, roads and drainage, civil foundations and underground services. Claims resolution and mitigation. Client: Black & Veatch.
5 Monate, Okt. 2006 - Feb. 2007
Project Manager (Oil/Gas)
Carillion
Regional Head Quarter (RHQ) Trinidad and Tobago, W.I Preparation of proposals and bid valuations for Methanex Industrial Maintenance Service Contract, Petrotrin Turnaround Service Contract, Petrotrin Gasoline Optimization, etc. Internal training: Primavera 5.0, FIDIC Conditions of Contract for Construction, Quantity Survey.
Atlantic LNG Train 4 Trinidad and Tobago , WI Senior Site Manager for the mechanical erection of a 160,000m3 LNG double-wall storage tank inclusive of associated structures, piping, insulation, painting, E&I, and commissioning in a JV with TKK, Dywidag and MCE for Bechtel Oil & Gas. The team achieved 865,000 man-hours without any LTA or OSHA Recordable with a manpower peak of 285 employees and several smaller lower-tiers.
Regional Head Quarter RHQ (VA TECH MCE) Trinidad and Tobago, WI Overseeing technical aspects, preparation of proposals and bid valuations for ATLAS Methanol Project (5000mtpd), ACST Ammonia Project (2*2300mtpd), ALNG Train 4, etc. May 2002 – Aug 2003 seconded as General Manager to Gopeesingh General Contractors (1990) Limited to optimize the business in respect of the rental of cranes, forklifts, truck and trailers, etc. as well as general administration of the staff and equipment.
Titan Methanol (VA TECH MCE) Trinidad and Tobago, WI Responsible for all rotating equipment installation, alignment and commissioning, Responsible for refractory lining for Reformers, Secondary Reformers, Heat Recovery Systems and Boilers. Technical calculations, designing and studies for heavy lifts. Client: Lurgi Oil, Gas und Chemie.
Ausbildung von Alexander Kammerer
2 Jahre und 3 Monate, Juli 1995 - Sep. 1997
Graduate student researcher
University of California, Los Angeles
University of California, Los Angeles Field Of Study: Mechatronics Grade: Graduate student researcher summer 1995, 1996 and 1997 papers: I) Argon and Nitrous Oxide Flow through uniform Microchannels ii) Autorotation - Maple Seed
6 Jahre und 9 Monate, Okt. 1991 - Juni 1998
Mechatronics
JKU Linz
Major: Mechanical Engineering GPA: 3.52
4 Jahre und 10 Monate, Sep. 1986 - Juni 1991
Maschinenbau
HTBLA II Linz
Bundesministerium für Wirtschaft, Familie und Jugend Österreich Certificate 91.508/049798-I/3/12
Sprachen
Deutsch
Muttersprache
Englisch
Fließend
Portugiesisch
Gut
Spanisch
Grundlagen