Ing. Armando Castilla
Angestellt, Automation and Control Process Engineer, DuPont de Nemours
Wiesbaden, Deutschland
Suchst Du einen anderen Armando Castilla?
Über mich
Experience in Commissioning Instrumentation and Control Engineering. Experience in consulting, monitoring and testing in the Oil and Gas / Petro-chemical projects, O&M Engineer: - Technical support in Mechanical Completion, Precommissioning and Commisioning and Start of I&C systems. - Field instrumentation SAT 4-20mA/HART. - DCS architecture design und programming - Control System implemented by Vendor's. - Logic diagrams, loop diagram, I/O list, Alarm list. - Shut-down ESD architecture design & Cause and Effect diagrams. - SIS Loop test (Cause and Effect and Interlocks). - PLC - SCADA - Review of client's technical documentation and control of subcontracted discipline engineering documents. - Building monitoring instrumentation according to established engineering designs. - Following to Mounting sketches, Junction box wiring & Layout, Wiring diagram, Cable list, cable tray routing, P&IDs.
Werdegang
Berufserfahrung von Armando Castilla
Bis heute 2 Jahre und 9 Monate, seit Sep. 2021
Automation and Control Process Engineer
DuPont de Nemours
Responsible for the technical availability, operation, optimization, maintenance and lifecycle management of OT systems, production and infrastructure systems. DCS Programming Continuous/Batch/Sequences HLBL, SFC and Ladder Logic – ICC and IDE, Foxboro + FoxDraw/FoxView. SCADA. Maintain Siemens PLCs S7 Standalone packages. Technical support in Operations, Maintenance, Engineering Design. Managing and/or executing site automation projects.
8 Monate, Apr. 2018 - Nov. 2018
Instrumentation and Control Engineer
Freelancer
Provide technical support to industrial and university projects. Cause-Effects review, Programming of Logic Solvers, Characterization of pilot laboratory plants
1 Jahr, Apr. 2017 - März 2018
Elektroingenieur
Yara International
Basic, FEED and Detail Projects Engineering in accordance with the established requirements, structure the design review, application of the design practices, change management and safety reviews (Hazop, Lopa, What If, SIL MAR, among others) in plants; develop engineering designs in accordance with Yara and international standards; Pre-commissioning, Commissioning and Start-up of the HUB Projects of Yara Latin America. - Functional Safety, ISA, API, ISO ESD / SIS, PLC /DCS
6 Monate, Okt. 2016 - März 2017
AUTOMATION PROJECT'S ENGINEER
Tesis IT and Automation
Industrial Automation Project's Engineer. Engineering Design and Project Management Services. Project Engineer- Electrical to design innovative electrical services and control systems to produce client's products. - Programmable Logic Controllers (PLC) and Supervisory Control And Data Acquisition (SCADA) ALLEN BRADLEY. - Field Instrumentation, Hart Protocol
1 Jahr und 3 Monate, Aug. 2015 - Okt. 2016
Control and Instrumentation Engineer
ICG
- Control and Instrumentation Engineer O&M. Consultant Mechanical Completion, Precommisioning, Commisioning and Start Up - Safety Instrumented System (SIS - ESD) Triconex - Distributed Control Systems (DCS). Foxboro - Programmable Logic Controllers (PLC). ALLEN BRADLEY. - Supervisory Control And Data Acquisition (SCADA) ALLEN BRADLEY. - Field Instrumentation. Hart Protocol
1 Jahr und 2 Monate, Juli 2014 - Aug. 2015
Instrumentation and Control Engineer
ACI PROYECTOS
- Instrumentation and Control Engineer Support Front for Automation and Control Work-Stream to Ecopetrol - Loop test's responsible. - Validation of Mechanical Completion: - Precommissioning: DCS SAT Tests, Receipt Functionality Tests field instrumentation. - Commissioning and start of the instrumentation and control systems - Review of Technical Documents, P&ID, Isometrics, General Plans and diagrams, DGC and so on.
5 Monate, Feb. 2014 - Juni 2014
Relay and Equipment Testing Specialist
IEB
-Testing Electrical Devices Engineer - Testing the Automatic Transfer Switches Power, battery banks and industrial Chargers of new substations plants Cartagena refinery (Leader of my test team). - Development of testing protocols Automatic Transfer Switches (ATS) systems Batteries and Chargers substations Reficar new project.
1 Jahr, Juli 2013 - Juni 2014
Trainee - Instrumentation and Control engineer
ECOPETROL SA
- Instrumentation and Control Engineer, support primarily for Reficar's Alkylation I&C engineer. - Writing summaries Interlocks for security systems driven process failures (SIS) Alkylation plant - Drafting of the explanatory document control loops present in Delayed Coking Unit Reficar plant. - Verification of instrumentation present on the Waste Water Treatment unit (U143), Offsites / Tank Farm units (U146) and Industrial Services Unit (USI) of the Master Plan of the new refinery in Cartagena.
6 Monate, Jan. 2013 - Juni 2013
Maintenance Trainee
Worldtex Caribe
-Maintanance Management Engineer. - Manage and / or perform work activities in the area of electrical and electronic maintenance. Audits to electrical and electronic works of staff of the same area. Personnel management. - Arrange training activities of electrical and electronic maintenance to staff. - Driving censuses machines inactive positions of the different areas of the company with regard to maintenance.
Ausbildung von Armando Castilla
Bis heute 4 Jahre und 8 Monate, seit Okt. 2019
Automation and Safety
Universität Duisburg-Essen
2018 - 2018
Gestión de proyectos
Fundación Universitaria Tecnológico de Comfenalco
2017 - 2017
Finanzverwaltung (Financial Administration)
Universidad Tecnológica de Bolívar
5 Jahre und 9 Monate, Jan. 2008 - Sep. 2013
Electronics and Communication Engineering
Universidad Tecnológica de Bolívar
PGA: 4.1 / 5.0 (Colombian standard)
Sprachen
Spanisch
Muttersprache
Englisch
Fließend
Deutsch
Fließend