Byongson Park

Angestellt, Piping Stress Engineer, Samsung Heavy Industries Co., Ltd

Schwaikheim, Deutschland

Über mich

- Acquired a work permit in Germany - Developed stress analysis calculation programs such as local stress calculation at trunnion, ASME B31.3 pipe wall thickness calculation, and etc. using Excel, Access or Visual basic application. - Develop a stress analysis specification at the first stage of a project. - Review P&ID and Line List and correct errors to reduce repetitive work. - Interact with other disciplines to resolve project concerns such as structure loadings and equipment allowable nozzle loads. - Prepare a critical line list based on P&ID, Line List and project specifications to conduct the stress analysis. - Analyze critical piping systems using commercial softwares such as CAESAR II and review the input and the output to meet client’s requirements. - Prepare stress analysis reports and procurement requisitions for spring supports, expansion joints, cold insulation supports, and hold down supports. - Conduct a field check on site to confirm piping systems

Fähigkeiten und Kenntnisse

Engineering
CAESAR II
Mathcad
AutoCAD
VBA
Autodesk Navisworks
MS Office

Werdegang

Berufserfahrung von Byongson Park

  • Bis heute 8 Jahre und 8 Monate, seit Okt. 2015

    Piping Stress Engineer

    Samsung Heavy Industries Co., Ltd

    - Ruby FPSO Project, Reliance Industries Limited, India (February 2020 - Present) - LNG System Test Facility Plant Project, Geoje Yard (October 2018 - October 2020) - Mad Dog Phase 2 FPU Project, BP, Gulf of Mexico (November 2016 - September 2018) - Egina FPSO Project, Total, Nigeria (October 2015 - October 2017)

  • 7 Jahre und 9 Monate, Jan. 2008 - Sep. 2015

    Piping Stress Engineer

    SK Engineering & Construction Co., Ltd.

    - Karbala Project, SCOP, Iraq (February 2014 - September 2015) - UHV Project, IRPC, Thailand (September 2012 - September 2015) - WASIT Gas Program, Saudi Arabian Oil Company, Saudi Arabia (February 2011 - September 2015) - BAB Gas Compression Project, ADCO, United Arab Emirates (May 2009 - February 2012) - SK Energy Projects, Republic of Korea Incheon Complex Project (November 2011 - June 2011) NEP FEED Flexibility Project (January 2010 - January 2011) Minor Projects (2008 - 2009)

Ausbildung von Byongson Park

  • 2 Jahre, März 2006 - Feb. 2008

    Mechanical Engineering

    Hanyang University

    GPA: 3.61 out of 4.0

  • 7 Jahre, März 1999 - Feb. 2006

    Mechanical Engineering

    Hanyang University

    GPA: 3.63 out of 4.0

Sprachen

  • Englisch

    Fließend

  • Deutsch

    Grundlagen

  • Koreanisch

    Muttersprache

21 Mio. XING Mitglieder, von A bis Z