Mag. Carlos Tamayo

Angestellt, Customer Care Manager, Buhler

Vienna, Österreich

Fähigkeiten und Kenntnisse

• Over ten years of combined experience in product
• Strong engineering background and technical know
• Excellent personal and organizational skills
• Advanced computer skills in Autocad Microsoft O
Maintenance and Repair
Plant Maintenance
SAP Plant Maintenance (SAP PM)
Six Sigma Green Belt
Project Management
Project Engineering

Werdegang

Berufserfahrung von Carlos Tamayo

  • Bis heute 5 Jahre und 2 Monate, seit Apr. 2019

    Customer Care Manager

    Buhler

  • 3 Jahre und 1 Monat, Nov. 2013 - Nov. 2016

    Engineering Services Manager

    Hellers

    • Manage and schedule the maintenance and engineering department with a total of 15 employees • Accountable for reducing plant downtime, coordinate plant and building repairs and maintenance and develop preventive maintenance program • Manage contractors during special projects and repair and maintenance • Responsible for equipment installation and commissioning • Liaise with operation and health and safety departments to make improvements that will reduce lost time accidents and injury frequency

  • 2 Jahre und 6 Monate, Jan. 2010 - Juni 2012

    Project Engineer

    Maple Leaf Foods

    • Coordinated the installation of additional equipment to a production line worth $2.3M • Led capital equipment installation of projects ranging from $5,000 to $340,000 • Conducted a six sigma project on a robotic palletizing system, improving the system reliability and providing labour savings • Supported the maintenance department with technical and engineering related issues aiming to reduce mechanical downtime • Developed a plant asset assessment for capital investment and capital planning

  • 1 Jahr und 4 Monate, Okt. 2008 - Jan. 2010

    Maintenance Manager

    Maple Leaf Foods

    • Reduced maintenance downtime by 1.3% in the first 3 months • Reduce maintenance expenditure by $75,000 • Coordinated the implementation of SAP for the maintenance department • Developed annual maintenance budget • Provided technical expertise and troubleshooting skills to maintenance employees • Oversaw and supervised contractors during special projects • Dealt with union related issues like overtime allocation, grievances and tool allowance • Active member of the Joint Health and Safety Committee

  • 1 Jahr und 3 Monate, Aug. 2007 - Okt. 2008

    Maintenance Supervisor

    Maple Leaf Foods

    • Dismantled, transferred, reinstalled and commissioned a complete production line to a different facility • Provided maintenance support and technical expertise during production ramp up of transferred production line • Coordinated maintenance and sanitation employee tasks • Supervised a crew of 7 maintenance employees and provided support on equipment repairs and troubleshooting • Maintained plant efficiency above 96% during 8 months before plant closure

  • 1 Jahr und 3 Monate, Juni 2006 - Aug. 2007

    Operations Analyst

    Maple Leaf Foods

    • Facilitated a six sigma project on automatic palletizing reducing waste by 20%, reduced labour and increased equipment reliability and uptime • Led the implementation of finished goods lot control project at the plant level • Reviewed capacity, throughput and labour allocation data for annual budget • Provided coverage for supervisor during vacation periods • Successfully modified the production schedule template to automatically generate finished goods lot control numbers

  • 3 Jahre und 10 Monate, Apr. 2001 - Jan. 2005

    Production Scheduler and Planner

    Art Candle and Fragrance

    • Prepared the Master Production Schedule based on finished goods inventory, sales forecasts, purchase orders and production capacity • Calculated Materials Requirement Planning to meet the Master Production Schedule • Conducted inventory control check ups of raw materials based on sales forecast and purchase orders • Controlled shipments of products to distribution centre based on inventory levels and required delivery dates

  • 1 Jahr und 1 Monat, Apr. 2000 - Apr. 2001

    Production Supervisor

    Pax-All Manufacturing

    • Batch making and execution of a pre-established production schedule according to finish goods inventory and customer’s needs • Set up filling and labelling machines according to product’s requirements • Performed periodical inspections to ensured optimal quality of finish products • Supervised daily production achieving economical goals

Ausbildung von Carlos Tamayo

  • 1 Jahr und 1 Monat, Juni 2011 - Juni 2012

    Project Management

    Mount Royal University

  • 1 Jahr und 7 Monate, Jan. 2005 - Juli 2006

    Master of Engineering

    University of Toronto

  • 2 Jahre und 2 Monate, Juni 2002 - Juli 2004

    Operations Management

    Centennial College

  • 6 Jahre und 6 Monate, Juli 1993 - Dez. 1999

    Industrial Engineering

    EAFIT University

Sprachen

  • Spanisch

    Muttersprache

  • Englisch

    Fließend

  • Französisch

    Grundlagen

Interessen

Photography
Digital Photography
Sports
Hiking
Camping

21 Mio. XING Mitglieder, von A bis Z