Mag. Carlos Tamayo
Angestellt, Customer Care Manager, Buhler
Vienna, Österreich
Werdegang
Berufserfahrung von Carlos Tamayo
Bis heute 5 Jahre und 2 Monate, seit Apr. 2019
Customer Care Manager
Buhler
3 Jahre und 1 Monat, Nov. 2013 - Nov. 2016
Engineering Services Manager
Hellers
• Manage and schedule the maintenance and engineering department with a total of 15 employees • Accountable for reducing plant downtime, coordinate plant and building repairs and maintenance and develop preventive maintenance program • Manage contractors during special projects and repair and maintenance • Responsible for equipment installation and commissioning • Liaise with operation and health and safety departments to make improvements that will reduce lost time accidents and injury frequency
2 Jahre und 6 Monate, Jan. 2010 - Juni 2012
Project Engineer
Maple Leaf Foods
• Coordinated the installation of additional equipment to a production line worth $2.3M • Led capital equipment installation of projects ranging from $5,000 to $340,000 • Conducted a six sigma project on a robotic palletizing system, improving the system reliability and providing labour savings • Supported the maintenance department with technical and engineering related issues aiming to reduce mechanical downtime • Developed a plant asset assessment for capital investment and capital planning
1 Jahr und 4 Monate, Okt. 2008 - Jan. 2010
Maintenance Manager
Maple Leaf Foods
• Reduced maintenance downtime by 1.3% in the first 3 months • Reduce maintenance expenditure by $75,000 • Coordinated the implementation of SAP for the maintenance department • Developed annual maintenance budget • Provided technical expertise and troubleshooting skills to maintenance employees • Oversaw and supervised contractors during special projects • Dealt with union related issues like overtime allocation, grievances and tool allowance • Active member of the Joint Health and Safety Committee
1 Jahr und 3 Monate, Aug. 2007 - Okt. 2008
Maintenance Supervisor
Maple Leaf Foods
• Dismantled, transferred, reinstalled and commissioned a complete production line to a different facility • Provided maintenance support and technical expertise during production ramp up of transferred production line • Coordinated maintenance and sanitation employee tasks • Supervised a crew of 7 maintenance employees and provided support on equipment repairs and troubleshooting • Maintained plant efficiency above 96% during 8 months before plant closure
1 Jahr und 3 Monate, Juni 2006 - Aug. 2007
Operations Analyst
Maple Leaf Foods
• Facilitated a six sigma project on automatic palletizing reducing waste by 20%, reduced labour and increased equipment reliability and uptime • Led the implementation of finished goods lot control project at the plant level • Reviewed capacity, throughput and labour allocation data for annual budget • Provided coverage for supervisor during vacation periods • Successfully modified the production schedule template to automatically generate finished goods lot control numbers
3 Jahre und 10 Monate, Apr. 2001 - Jan. 2005
Production Scheduler and Planner
Art Candle and Fragrance
• Prepared the Master Production Schedule based on finished goods inventory, sales forecasts, purchase orders and production capacity • Calculated Materials Requirement Planning to meet the Master Production Schedule • Conducted inventory control check ups of raw materials based on sales forecast and purchase orders • Controlled shipments of products to distribution centre based on inventory levels and required delivery dates
1 Jahr und 1 Monat, Apr. 2000 - Apr. 2001
Production Supervisor
Pax-All Manufacturing
• Batch making and execution of a pre-established production schedule according to finish goods inventory and customer’s needs • Set up filling and labelling machines according to product’s requirements • Performed periodical inspections to ensured optimal quality of finish products • Supervised daily production achieving economical goals
Ausbildung von Carlos Tamayo
1 Jahr und 1 Monat, Juni 2011 - Juni 2012
Project Management
Mount Royal University
1 Jahr und 7 Monate, Jan. 2005 - Juli 2006
Master of Engineering
University of Toronto
2 Jahre und 2 Monate, Juni 2002 - Juli 2004
Operations Management
Centennial College
6 Jahre und 6 Monate, Juli 1993 - Dez. 1999
Industrial Engineering
EAFIT University
Sprachen
Spanisch
Muttersprache
Englisch
Fließend
Französisch
Grundlagen