Catalin Lepadatu

Bis 2012, IT Project Manager, General Electric Oil & Gas

Ludwigsburg, Deutschland

Fähigkeiten und Kenntnisse

Project management
Manufacturing engineering
Engineering
Microsoft Active Directory
Automation
Microsoft Exchange Server
Project Planning
IT Service Management
IT Operations
Mechanical Engineering
IT Troubleshooting
Troubleshooting
Training
Contract Negotiation
IT Strategy
System Deployment
System Design
Team leadership
Petroleum
Change Management
Software Documentation
Disaster Recovery

Werdegang

Berufserfahrung von Catalin Lepadatu

  • 1 Jahr, März 2014 - Feb. 2015

    Engineer IV

    Universal Pegasus

    Trained as Facility Design Engineer, gained experience and a variety of system specializations in facilities management. Adept at handling multiple projects simultaneously, whether working independently or as part of a team. Conscientious and mindful of all local, state and federal safety standards. Worked as part of the team in developing initial concept of the project Preparing detailed engineering drawings

  • 2 Jahre und 1 Monat, März 2012 - März 2014

    Project Engineer

    URS Corporation

    Experience in project management, engineering design, sub-contractor management, and administration for projects. Major clients included, Piedmont Natural Gas, BP and other public and private clients. Assumed direct accountability for project performance, quality, schedule, cost, and safety. Prepared and implemented the QA/QC process for the Technical Specifications and Construction Drawings; ensured the deliverables are completed on time and at the desired quality.

  • 12 Jahre und 11 Monate, Mai 1999 - März 2012

    IT Project Manager

    General Electric Oil & Gas

    Manages the information technology department in accordance with organizational policies and goals. Helps business operations utilize information systems to improve efficiency. Keeps computer equipment, hardware, and software updated to meet organizational needs. Integral IT team leader providing network support and administration for 1000 + multi-company users,. Manage helpdesk for 6 national locations and over 15 small office locations, 24/7 on call network service support.

  • 9 Monate, Sep. 1998 - Mai 1999

    Project Engineer

    Sulzer Chemtech AG

    Responsible for scheduling, financial, and technical requirements in compliance with industry, company and regulatory standards. In charge of purchasing the materials, inspecting and release them to the production. In charge of the relationship between the Designing team and production. Ensuring the accuracy within the manufacturing plant in Mexico and the Engineering department in US. Making sure that all projects are completed within time and according to project specs.

  • 1 Jahr und 11 Monate, Nov. 1995 - Sep. 1997

    Design Engineer

    Southwest Research Institute

    Develop the step by step design and instructions for technicians on site to utilize the equipment during the shutdown of the plant. Traveled as need it for on site assistance. Design new parts for the equipment based on the complexity of the site from the client drawings. On call 24\7 as the crew traveled to sites. In charge of maintaining digital information and communication between the crews and the main office.

  • 1 Jahr und 1 Monat, Nov. 1994 - Nov. 1995

    Production Engineer

    Senior Flexonics Pathway

    In charge of creating the design per client specs and follows up through production. Checked the design and issue revisions as necessary for production for the engineering team. In charge of all quick turnaround orders. Create an inventory of standard parts for the service team. The REP on site for client inspection throughout the process.

  • Production Engineer

    Pathway

    In charge of creating the design per client specs and follows up through production. Checked the design and issue revisions as necessary for production for the engineering team. In charge of all quick turnaround orders. Create an inventory of standard parts for the service team. The REP on site for client inspection throughout the process.

Ausbildung von Catalin Lepadatu

  • 4 Jahre und 10 Monate, Sep. 1985 - Juni 1990

    Mechanical Engineering

    Politehnica University of Bucharest

  • Project Management

    University of Houston

    Project Manager

Sprachen

  • Englisch

    Fließend

  • Rumänisch

    Muttersprache

21 Mio. XING Mitglieder, von A bis Z