Gustavo Pasquali Steinhorst

Angestellt, Coordinator Industrial Engineering, ThyssenKrupp Elevator

Guaíba, Brasilien

Fähigkeiten und Kenntnisse

Process Engineer
Lean Manufacturing
Industrial Engineering
Business Development
Quality Management
Production Management
International experience
TPM
Manufacturing engineering
Layout
Cost analysis
Product Development
Lean Production
CAPEX
KPI
Supplier evaluation
Process Development
Production planning
AutoCAD
Project Management
English
Portuguese
willing to travel
Consulting
Lean Management
Change Management
Continuous Improvement
Kaizen
FMEA
Strategy
Leadership
SMED
PFMEA
5S
Excel
Management
Poka Yoke
TQM
Process optimization
Inventor
Operational Excellence
Budget
Assembly
VSM
Analyse
Fertigung
Prozesse

Werdegang

Berufserfahrung von Gustavo Pasquali Steinhorst

  • Bis heute 9 Jahre, seit Juni 2015

    Coordinator Industrial Engineering

    ThyssenKrupp Elevator

  • 11 Monate, Apr. 2014 - Feb. 2015

    Sabbatical year - Germany

    -

  • 1 Jahr und 3 Monate, Feb. 2013 - Apr. 2014

    Process Engineer

    Parker Hannifn

    • Support pricing team with process capability analysis • Development and improvement of processes: machining, welding, assemble, test, painting that attend safety, quality, productivity and low cost • Creation and review of process documentation • Review and implementation of customers procedures • PFMEA development • Implementation of Lean concepts and tools • Layouts creation, validation and implementation • Budget controlling • Equipment acquisition • Maintenance of machines and building

  • 1 Jahr und 4 Monate, Nov. 2011 - Feb. 2013

    Value Stream Supervisor

    Parker Hannifin

    • Supervise the manufacturing activities looking for continuous improvement and safety to all employees • Supervise and support the production planning and control • Follow up and improvement of KPI's • Implement and sustain lean and quality tools to improve production performance • Manage a multifunctional team • Visit and support Parker costumers, both national and international, and the Parker Sales team as well

  • 1 Jahr und 5 Monate, Juli 2010 - Nov. 2011

    Trainee

    Parker Hannifin

    • Value Stream Mapping in the shop floor and administrative areas • Time analysis of production process • Projects to improve material flow • Development of manufacturing and assemble processes • Creation and review of procedures for ISO 9001:2008 • 5S and Total Productive Maintenance shop floor training

  • 8 Monate, Dez. 2009 - Juli 2010

    Production Analyst

    Unifertil

    • Follow up and improvement of industrial indicators • Coordination of building maintenance of two industrial sites • Planning of infrastructure expansion – buildings and equipment • Contracting, follow up and coordination of suppliers during infrastructure expansion – building and equipment • Maintenance team coordination – mechanical, electric, woodwork and building • Process improvement and waste reduction in mixing process of fertilizer • Internal auditor of ISO 9001:2008

  • 2 Jahre und 1 Monat, Juni 2007 - Juni 2009

    Consultant

    Qualitin

    • Implement key performance indicators in different types of companies (building, electronic industry, hotel chain, sport club) • Conduction of trainings in quality concepts and tools • Internal and external auditor of rating system of PGQP (2007 e 2008) • Conduction of projects to implement quality tools inside customers • Development of customer satisfaction survey • Standardization of procedures and documents for inside company and customers

  • 2 Monate, Mai 2008 - Juni 2008

    Production Engineering Intern

    Accera Supply Chain Solutions

    • Implement the software Preactor, in customers, for production scheduling

  • 1 Jahr, Aug. 2006 - Juli 2007

    Scientific Initiation Scholarship

    Business School of Administration

    • Paper presentation on 18º Hall Undergraduates of UFRGS – Study of economic and financial feasibility, organization and management of chains of biodiesel in Brazil • Support Master and Teacher in biofuels surveys

  • 1 Jahr und 2 Monate, Jan. 2005 - Feb. 2006

    Production Engineering Intern

    GKN Driveline

    • Follow up of key performance indicators of both units of Porto Alegre and Charqueadas • Implement concepts of Lean Manufacturing (5S, Kaizen, Loss Time Analysis, Visual Management, Standard Work and Autonomous Maintenance) • Process improvement based on TPM (Total Productive Maintenance) • Training programs focus on setup time reduction • Preparation of samples • Activities developed as a manufacturing leader, leading a group of 20 employees

Ausbildung von Gustavo Pasquali Steinhorst

  • 1 Jahr und 7 Monate, Juni 2017 - Dez. 2018

    MBA Business Management

    Fundação Getúlio Vargas

  • Bis heute 9 Jahre und 9 Monate, seit Sep. 2014

    Master of Science (M.Sc.), Production Engineering and Management

    Hochschule Ostwestfalen-Lippe

    Incomplete

  • 1 Jahr und 8 Monate, Mai 2011 - Dez. 2012

    Lean Manufacturing

    Faculdade de Desenvolvimento do Rio Grande do Sul

  • 6 Jahre und 11 Monate, Okt. 2002 - Aug. 2009

    Production Engineering

    Universidade Federal do Rio Grande do Sul

Sprachen

  • Portugiesisch

    Muttersprache

  • Englisch

    Fließend

  • Deutsch

    Gut

  • Spanisch

    Grundlagen

Interessen

Piano
guitar
rowing
boy scout

21 Mio. XING Mitglieder, von A bis Z