Ioana Macovei

Angestellt, Project manager, LATelec GmbH, Latécoère Group

Abschluss: Dipl. Engineer, Gh. Asachi Technical University Iasi

Hamburg, Deutschland

Fähigkeiten und Kenntnisse

Catia V5 (Assembly and Electrical design)
Primes
MS Office Tools
Communication skills
Team leadership
Assertiveness
Empathetic person
Project Management
Experienced organizer and coordinator
Flexible and adaptable to new
Proactiv
Customer relationship
Continuous Improvement
Root Cause Analysis
Creativity
Englische Sprache
Deutsch
Multicultural experience
Risk Management

Werdegang

Berufserfahrung von Ioana Macovei

  • Bis heute 6 Jahre und 8 Monate, seit Okt. 2017

    Project manager

    LATelec GmbH, Latécoère Group

    Managing Prototypes projects/ programs: electrical harnesses production for aeronautic industry (Customers: Airbus - Wings of tomorrow (1 project), Lufthansa Technik (6 projects)) and for military industry Rheinmetall Electronics (9 projects), for military drones ADASI (1 project), VG Certification VG96927-2 C and D (1 project)). Main activities: planning , organizing, leading, controlling the project activities (including the financial follow up and customer communication), offers preparation.

  • 1 Jahr und 6 Monate, Aug. 2014 - Jan. 2016

    Planning Engineer

    LATelec GmbH, Latécoère Group

    Establish the manufacturing phases and production cycle of the products. Calculate the final production cycle and production time taking into account the needs of all departments and the contractual requests between the company and the customer. Retro planning,daily production follow up, coordination between the internal teams and between the sites. Observe and analyse the work evolution of the departments, adjust and improve the cycle times.

  • 5 Monate, Apr. 2014 - Aug. 2014

    Program Manager Deputy

    LATelec GmbH, Latécoère Group

    Project: Transfer of electrical harnesses production in low cost country Products: electrical harnesses in wings area for A330 Long Range and A320 Sigle Aile, A400M, A380 Main activities: • plan, organize and steer the activities, identify project risks& opportunities, production follow up, moderate meetings between all internal stake holders and between sites from different countries. • follow up: teams activities progress and deliveries

  • 5 Monate, Sep. 2012 - Jan. 2013

    Project Manager Deputy

    LATelec GmbH, Latécoère Group

    Project: A350XWB Crown Main activities: organize and follow up teams activities progress and deliveries, moderate meetings with the team and with the customer, reports

  • 11 Monate, Nov. 2011 - Sep. 2012

    Team Leader, Installation Drawing Team, A350XWB Wings Project

    LATelec GmbH, Latécoère Group

    Daily pre check meetings with Manufacturing Engineering and Airbus Design Office in order to validate the drawings before the release process ( review of harness installation drawings, brackets installation drawings, label installation drawings, equipment installation drawings) - Technical support of the team - Organizing the work in the team: provide constant work and make sure that the work was delivered on time - The crew was composed of 5 designers

  • 5 Monate, Juli 2011 - Nov. 2011

    Electrical Designer Engineer, Interface Management Team, A350XWB Wings

    LATelec GmbH, Latécoère Group

    Design mockup check and correction of Interface Requests ( check of bracket proposel & interface points position, bracket properties in Catia) PDM Link check and correction of the Interface Requests (bracket proposel properties) Present the daily status internal and weekly status to Airbus Programs used: Catia V5, PDM Link, A350 VPM, Trend, MS Office

  • 4 Monate, Apr. 2011 - Juli 2011

    Electrical Designer Engineer, Quality Check Team, A350XWB Wings

    LATelec GmbH, Latécoère Group

    Rendundant Design Failure document creation: - Design Mockup check - identifing the accepted non compliance situations (according SIDP20, SIDP33, SIDP92 requirements) and prepare the documentation neccessary for the deviation creation For 3 weeks I substitut the RDF Team Leader Programs used: Catia V5, PDM Link, A350 VPM, Trend, MS Office

  • 9 Monate, Aug. 2010 - Apr. 2011

    Electrical Designer Engineer, Validation and Verification Team, A350XWB

    LATelec GmbH, Latécoère Group

    Validation and Verification Team, A350XWB Wings Project Proof of compliance creation ( check of the design mockup according with SIDP requirments, identify the existing issues and request to the design team to corrected it, create the documents to prove that the design is compliant with Airbus rules) For 3 weeks I substitut the Validation and Verification Team Leader Programs used: Catia V5, PDM Link, A350 VPM, Trend, MS Office, BigDB

  • 10 Monate, Sep. 2009 - Juni 2010

    Zone Leader, A400M Project, Electrical Department

    Ensedo in cooperation with P3 Digital Services GmbH

    Zone Leader for Instalation Zone 3 and Instalation Zone 4, Main Deck, Section 13, MSN6 Technical support of the zone team. Escalating blocking points. Work planning Establish the workload and the target dates Organizing the work in the team and make sure that all target dates will be achieved Claims The team was composed of 6 to 10 designer Programs used: Catia V5, Primes, Windchill Browser, Net DMU A400M, Assignment Database, SSCI Tool , Circe-I, Trend, GeoSearch, MS Office

  • 6 Monate, Apr. 2009 - Sep. 2009

    Team Leader, A400M Project, Electrical Department

    Ensedo in cooperation with P3 Digital Services GmbH

    Airbus MSN 4, system 1 harnesses from sections: 13, 15, 17, 18, 3D Design according with Technical Design Directives and System Installation Design Principle: Electrical design ( bundle routing) Structure design ( bracket proposal) Responsible for system1 (1 M routes), TVA harnesses Organizing the work Technical support of the team The team was composed of 10 designer Programs used: Catia V5, Primes, Windchill Browser, Net DMU A400M, Assignment Database, MS Office, Circe-I

  • 8 Monate, Sep. 2008 - Apr. 2009

    Electrical Designer Engineer for A400M Project

    Ensedo in cooperation with P3 Digital Services GmbH

    Airbus MSN3, MSN 4, Sections: 13, 15, 17, 18 3D Design according with Technical Design Directives and System Installation Design Principle: Electrical design ( bundle routing) Structure design ( bracket proposal) Programs used: Catia V5, Primes, Windchill Browser, Net DMU A400M, Assignment Database

  • 2 Jahre und 9 Monate, Sep. 2005 - Mai 2008

    Project Manager, Textile family bussines

    S.C. Classic Prodcom S.R.L.

    comunnication with the client (companies from France, Holland, Italy), reception of raw materials, prepare the manufacturing steps and production cycles, follow up the production and make sure the delivery targets will be achieved, calculation of the employees salaries.

Ausbildung von Ioana Macovei

  • 2 Monate, Okt. 2007 - Nov. 2007

    Project Management

    Provided by LATelec GmbH, Latécoère Group

    Training

  • 3 Monate, März 2005 - Mai 2005

    Production Engineering and Management

    The Technical University of Crete, Greece

    Socrate Erasmus mobility

  • 5 Jahre und 1 Monat, Okt. 2001 - Okt. 2006

    Industrial Engineering and Bussines Management

    Gh. Asachi Technical University Iasi

Sprachen

  • Rumänisch

    Muttersprache

  • Englisch

    Fließend

  • Deutsch

    Gut

Interessen

Traveling
Painting& arts
Reading
Dancing
Music

21 Mio. XING Mitglieder, von A bis Z