Juan Carlos De Campo Salomon

Angestellt, manufacturing Director, Schaeffler

Mexiko

Fähigkeiten und Kenntnisse

Multilingual executive with more than twenty years
I have held different positions in England USA an
During my career I have worked in the areas of Man
Focussed in Industrialization projects Production
I am in pursuit of a business management career wh
..................................................
Specialies:
..................................................
Quality Productivity & Financial (Profit & Loss
CAPEX for Industrialization of new products in mas
Process development and technology
Production transfer projects form USA Germany and
Business case justifications
Lean manufacturing
Implementation of team leader and Shop floor manag
Talent Development and Retention
Problems solving and waste elimination by Six- Sig

Werdegang

Berufserfahrung von Juan Carlos De Campo Salomon

  • Bis heute 12 Jahre und 9 Monate, seit Sep. 2011

    manufacturing Director

    Schaeffler

    • Manufacturing of Power train components: Dual mass flywheels, Discs, Clutches, Self adjusting clutches and double Clutches for power shift transitions • Production transfer. • 250 million USD Annual Turn over. • P&L analysis focused on the production cost impact and cost reduction. • Business case justification. • Productivity & P+L improvements.

  • 8 Jahre und 1 Monat, Sep. 2003 - Sep. 2011

    Manager, Industrial engineering and process technology (LuK Puebla, Mexico)

    Schaeffler

    • Investment planning and production Headcount • Design of production lines, including the purchase of the machines, installation and start up of the production. • Process and costs analysis, controlling the machine’s capacities and utilization. • Cost calculation for new products • Lean Manufacturing responsible. • Responsible for the manufacturing engineering of machining, assembly, press shop and HT areas. • Industrialization projects • Production transfer (Germany – USA – Mexico).

  • 1 Jahr und 2 Monate, Aug. 2002 - Sep. 2003

    Project leader and Manufacturing engineer

    Schaeffler

    Introduction of new projects in the context of the APQP and PPAP. according to our customers depends, e.g. PSO for Daimler Chrysler or VDA 6,1 for Volkswagen. • Design and Construction of machines • Lay outs design, including purchase of the machines and release in to production. • Regular activities as Manufacturing engineer such as PFMEA, route sheets, work instructions, layouts, control plans, etc.

  • 10 Monate, Okt. 2001 - Juli 2002

    Program Manager PMO

    Schaeffler

    • Introduction of new projects in the context of the APQP and PPAP. • In eight months, 10 introductions of new products for OE customers (APQP and PPAP), and 10 for After mark customers • Further training and introduction of the German LuK software for project administrator (PV-2) in the entire LuK factory in Puebla

  • 1 Jahr und 1 Monat, Apr. 2001 - Apr. 2002

    Process engineer in The Assembly department (Puebla, Mexico).

    Schaeffler
  • 2 Monate, Apr. 2001 - Mai 2001

    Training at LuK headquarters (Bühl, Germany).

    Schaeffler

    • Enabled for the use of LuK-Software “Projektverfolgung –V. 2” (PV-2) • Training in production process such as: ​- Heat treatment, Assembly lines, and Investment calculations.

  • 8 Monate, Sep. 2000 - Apr. 2001

    Process engineer in The Assembly department (Puebla, Mexico).

    Schaeffler

    • Construction of new tools and device for new products • Upgrade of the Lay out the assembly lines in the company. • Transport and packing calculations • Investment calculations • Automation on of the production lines • Regular activities as Manufacturing engineer such as PFMEA, route sheets, work instructions, layouts, control plans, etc.

  • 1 Jahr, Sep. 1999 - Aug. 2000

    Process engineer in the Heat treatment department (Puebla, Mexico).

    Schaeffler

    • Design of the smoke extraction system • Design of the process automation. • Metallographic analyse • Regular activities as Manufacturing engineer such as PFMEA, route sheets, work instructions, layouts, control plans, etc.

  • 2 Jahre und 6 Monate, Apr. 1997 - Sep. 1999

    Process engineer in the Stamping and Machining departments (Puebla, Mexico).

    Schaeffler

    • Investment Calculations • Construction and installation of Presses Acoustic cabin • Layout improvement of the entire Press department. • Works with the set-up sheets • Process realises of the new products. • Programming and calibrating of the new spring measuring machine.

Ausbildung von Juan Carlos De Campo Salomon

  • 2 Jahre, Juni 2013 - Mai 2015

    ​PgDip in Strategic Management

    University: UDLAP (Universidad de las Americas Puebla)

  • 2 Jahre, Juni 2013 - Mai 2015

    Master in Business Administrator (MBA)

    University: UDLAP (universidad de las Americas Puebla)

  • 1 Jahr und 10 Monate, Feb. 2013 - Nov. 2014

    Six Sigma Black Belt

    Schaeffler grupo academy

  • 5 Jahre und 3 Monate, Juni 1993 - Aug. 1998

    BS in Industrial Engineering

    UMAD University

    ​Thesis (Diploma): Optimize the production’s process.

Sprachen

  • Deutsch

    Fließend

  • Englisch

    Fließend

  • Spanisch

    Muttersprache

21 Mio. XING Mitglieder, von A bis Z