  • Bis heute 11 Jahre und 10 Monate, seit Aug. 2012

    Power supply Superintendent

    Colas Rail

  • 4 Monate, Sep. 2011 - Dez. 2011

    Project Coordinator Engineer

    Trident Electro Mechanical Contracting Co. (TEMCo)

    As an Assistant Engineer and Responsible for Circle Line MRT / Circle Line Extension C830/C830A in Power supply Group 43 Team in Testing & Commissioning Dept. Project Supervisor for MRT Works (North-East Line, North-South Line, East-West Line, & Tanah Merah to Changi Airport.) Site supervisor, Site Management, site coordinator and Coordination for all Construction Projects;

  • 6 Jahre und 4 Monate, Juni 2005 - Sep. 2011

    Engineer

    Alstom

    Major duties and responsibilities: Responsible for CCL/CLE C830/C830A Power supply Group 43 Team in Testing & Commissioning Dept.Taking over Inspection and prepare punch list rectification with construction team before start to pre-commissioning. Performing Witness for Factory Accept Test (FAT) prior to delivery of any equipments/materials to site. Organize and conduct Witness for Site Acceptance Test between LTA Main Client Operation Team and Testing Contractor Team.

  • 2003 - 2005

    Project Engineer

    FURUKAWA ELECTRIC CO.LTD.

    Coordination with Power Grid Main Client and Sub-contractor on Site. Handling site Permit. Cable Laying and Cable Jointing for (230KV, 66KV, 22KV, 6.6KV, LT. Cables) Erection, Testing and Commissioning (Assistance) for License Electrical Works. (P.E.) HT switchgears, Transformers Installation, Cabling works, Cable trays, Battery banks, Communication system and Fire protection system etc.

  • 2000 - 2003

    Supervisor

    MEIDEN SINGAPORE PTD LTD.

    Coordination with Main Client, Civil Works Contractor, System Works Contractor, and Sub-contractor on Site. Handling Permit to Work. Attend progress and coordination meeting at Works Train Office.MRT Project East-West Line Power Supply for (Tanah Merah to Changi Airport).

  • 1999 - 2000

    Project Engineer & Cable Jointer

    KONCAR FAR EAST LTD.

    Project at Maldives Airport Authority. Coordination with Main Client Owner Projects undertaken for Electrical and Mechanical Installation of High & Medium Voltage Cable Laying and Cable Jointing for (22KV, 6.6KV, LT. Cables) Erection, Testing and Commissioning (Assistance) for License Electrical Works. (P.E.) HT switchgears, Transformers Installation, Cabling works, Cable trays, Battery banks, Communication system and Fire protection system etc and Generator Up-Grading Works.

  • 1997 - 1999

    Self Employed

    TECHNO CABLE ENGINEERING PTE LTD.

    Coordination with Power Grid Main Client and Sub-contractor on Site. Handling site work Permit. Cable Laying and Cable Jointing for (230KV, 66KV, 22KV, 6.6KV, LT. Cables) Erection of 2 X 375MW Combined Cycle Power Plant, Tuas Stage II Development at Tuas Power Plant, Testing and Commissioning for (Assistance) License Electrical Works.(P.E.) HT switchgears, Transformers Installation, Cabling works, Cable trays, Battery banks, Communication system and Fire protection system etc.

  • 1994 - 1997

    Project Engineer

    ALSTOM POWER PTE LTD. / AEG PTD LTD.

    Coordination with Power Grid Main Client and Sub-contractor on Site. Project management, including Quotation, Tender Submission, Progress Claims, Variation Order and Site Supervision of A/Engineers and Sub-Contractors. Projects undertaken involved Power Plant and Process Plant Construction, Project undertaken in Substation Erection and Installation:

  • 1992 - 1994

    Project Supervisor

    FURUKAWA ELECTRIC CO.LTD.

    Cable Laying and Cable Jointing for (66KV, 22KV Cables) NUS 66KV Sub-Station to Clementi 66KV Sub-Station. Coordination with Power Grid Main Client and Sub-contractor on Site. Handling site work Permit.

  • 1990 - 1992

    , Supervisor

    MITSUBISHI CONSTRUCTION CO.LTD.

    MRT Project North-South & East-West Line Power Supply. Cable Laying and Cable Jointing for (66KV, 22KV, 6.6KV, LT. Cables) Electrical and Mechanical Installation of High & Medium Voltage (66KV, 22KV) Equipments in Singapore and ASEAN countries. Coordination with MRT Project Management Client and Sub-contractor on Site.

  • 1989 - 1990

    Supervisor

    CABLE PIRELLI (UK) LTD.

    Coordination with Power Grid Main Client and Sub-contractor on Site. Cable Trenching, Cable Laying for (230KV, 66KV, 22KV,and LT. Cables.) in Deep Sea and Mainland, Cable Termination, Cable Testing at Power Station, Sub-Station, Installation of Cable, Switchgear, in Local & Overseas Project Coordination for all Construction Projects.

  • 1987 - 1989

    Sr.Project Supervisor

    HITACHI ELECTRIC CO.LTD.

    Coordination with Power Grid Main Client and Sub-contractor on Site. Cable Trenching, Cable Laying for (230KV, 66KV, 22KV,and LT. Cables.) in Deep Sea and Mainland, Cable Termination, Cable Testing at Power Station, Sub-Station, Installation of Cable, Switchgear, in Local & Overseas Project Coordination for all Construction Projects.

Ausbildung von Logan Veera

  • 4 Jahre, Sep. 1972 - Aug. 1976

    SCHOOL

Sprachen

  • Englisch

    Fließend

  • Chinesisch

    Gut

  • Written English

    -

  • Tamil and Sample Malay

    -

Interessen

Hobbies/Interests Cycling
Tennis
Bowling
Soccer
Dart's
Fishing
Scuba & Deep Sea Diving
Traveling
and Camping.

21 Mio. XING Mitglieder, von A bis Z