Mohamad Nafari

Angestellt, Qualitätsingenieur, Schwarz Systems GmbH

Student, Metallurgical Engineering, Azad University of Karaj

Dortmund, Deutschland

Fähigkeiten und Kenntnisse

Welding Coordinator (ISO 14731)
Target Oriented
Welding Engineer
Materials Science
WPS & PQR preparation
NDT (Non Desctructive Testing)
Dampfkesselanlagen (Kraftwerksbau)
Pressure vessel
Heat exchanger
Piping
Pump
Industrial Valves Inspection
Spring Hanger & Spring Support Inspection
Steel structure
CATIA
Mechanical Desktop
AutoCad
Microsoft Office (Word Excel Outlook & PowerPo
Familiar with Standards : ASME ASTM AWS API
ISO 3834
Quality Control
RTi (Non-Destructive Testing)
UT (Non-Destructive Testing)
VT (Non-Destructive Testing)
MT (Non-Destructive Testing)
PT (Non-Destructive Testing)

Werdegang

Berufserfahrung von Mohamad Nafari

  • Bis heute 4 Jahre und 1 Monat, seit Mai 2020

    Qualitätsingenieur

    Schwarz Systems GmbH

    - Review manufacturing documentation as well as plan, coordinate and conducting of inspections. - Review of procurement of ASME standard parts. - Modification of procedures of manufacturing and inspecting pressure equipment. - Development/optimization of customer-oriented attitudes /Defining the quality improvement plan

  • 3 Jahre und 7 Monate, Juli 2016 - Jan. 2020

    Quality Engineer

    Mapna Group

    NDT Procedures Preparation (RT, UT, MT, PT and VT), WPS&PQR Preparation, Welder-Welding Operator testing Performance and Certificate Issuance, Material Entrance Inspection, Control of Fabrication Progress (Assembling, Welding and etc) Based on International Standards, Final Inspection of Manufactured Equipment, Hydrostatic Test, Valve & Spring Hanger Inspection, Follow up the Fabrication Progress and Finding Bottlenecks of Fabrication Progress. Reporting Results the Project Team.

  • 3 Jahre und 4 Monate, Nov. 2012 - Feb. 2016

    Manufacturing Supervisor

    Amyar Poolad Company

    NDT Procedures Preparation (RT, UT, MT, PT and VT), WPS&PQR Preparation, Welder-Welding Operator testing Performance and Certificate Issuance, Material Entrance Inspection, Control of Fabrication Progress(Assembling, Welding and etc) Based on International Standards, Final Inspection of Manufactured Equipment, Hydrostatic Test, Follow up the Fabrication Progress and Finding Bottlenecks of Fabrication Progress. Reporting Results the Project Team.

  • 1 Jahr, Juli 2010 - Juni 2011

    Quality Control Department / Head of Department

    Mashin Sazan Iran

    Different Departments Coordination, Performance of NDTs (UT, RTi, MT, PT and VT), WPS&PQR Preparation, Welder-Welding Operator testing Performance and Certificate Issuance, Material Entrance Inspection, In Progress Inspection of Equipment and Structures (Assembling, Welding and etc), Final Inspection of Manufactured Equipment, Hydrostatic Test & Functional Test.

  • 1 Jahr und 2 Monate, Juni 2009 - Juli 2010

    Welding Coordinator / Quality Control Department

    Masnou'at Felezi Sangin

    Performance of NDTs (UT, RTi, MT, PT and VT), WPS&PQR Preparation, Welder-Welding Operator testing Performance and Certificate Issuance, Material Entrance Inspection, In Progress Inspection of Equipment and Structures (Assembling, Welding and etc), Final Inspection of Manufactured Equipment, Hydrostatic Test & Functional Test, Surface preparation-Painting & Pickling Inspection, Preparation of As-Built Drawings and Final Data Books.

Ausbildung von Mohamad Nafari

  • Metallurgical Engineering

    Azad University of Karaj

  • Bis heute

    Welding Technology Engineering

    Iranian Welding Research and Engineering Center

  • Welding mechanics

    Yasouj University

Sprachen

  • Deutsch

    Gut

  • Englisch

    Fließend

  • Persian

    -

21 Mio. XING Mitglieder, von A bis Z