Musa KIRCI

Angestellt, Project Manager, USTAY

Bakü, Aserbaidschan

Fähigkeiten und Kenntnisse

Project Manager
Project management
Oil and Gas Formation Evaluation
Oilfield
Power plant
Power plants
Cost management
Cost Controlling
Target Costing
Project Planning
Financial Planning
Project
Pipeline Construction
proccess pipe
power pipe
Planning
Oil refining
Petroleum Products

Werdegang

Berufserfahrung von Musa KIRCI

  • Bis heute 6 Jahre und 7 Monate, seit Nov. 2017

    Project Manager

    USTAY

    Azerikimya EP300 Propylene and Ethylene Unit - Modernization Project -EP300 Propylene and Ethylene Unit -PSA Unit -Center Control Building -RDG-Substation Building -Storage Substation Building -Refinery Dry Gas Treatment Unit -Storage Laydown Area and Bullet Area -Interconnecting Pipe racks

  • 1 Jahr und 8 Monate, Apr. 2016 - Nov. 2017

    Project Manager

    DEMA

    Revamping of U‐7000 Crude Oil Unit and Installation of 3 heaters. ‐ Installation of Crude Oil Heaters, ‐ Demolishing of Existing Crude Oil Heaters, ‐ Revamping of Stripping Columns (Pre‐Flash Tower, Atmospheric Distillation Tower, Kerosene Tower, LT & HV Diesel Tower, Stabilizer Tower, Absorption Tower) ‐ Installation and demolishing of process piping,

  • 2 Jahre, Mai 2014 - Apr. 2016

    Project Manager

    CGS

    CGS, Severstal, Ruetgers‐ Tar Distillation Plant‐ Cherepovets, Russia ‐ Tar Distillation Plant, ‐ Utility Pipe Rack, ‐ Air Cooling Unit, ‐ Process Columns,

  • 1 Jahr, Juni 2013 - Mai 2014

    Project Manager

    Renaissance Heavy Industries

    TR, Volgograd, RUSSIA. ‐ Lukoil VGO Deep Conversion Complex Refinery Project. ‐ H2 Production Unit (Reformer) ‐ CSPU Unit,

  • 1 Jahr und 1 Monat, Juni 2012 - Juni 2013

    Project Coordinator

    Renaissance Heavy Industries

    ‐ Mary Fertilizer Project, Mary, Turkmenistan, ‐ Ethylene Cracker Project in Tobolsk, Russia, ‐ Rusvnyle PVC Project, Nijni Novgorod, Russia, ‐ Acrylic Acid Project, Salavat, Russia, Direct assisting, supporting and reporting to the COO. Generating and managing of EPC projects.

  • 1 Jahr und 1 Monat, Juni 2011 - Juni 2012

    Project Manager

    Emerson Process Management AG

    Istanbul, TURKEY and Stirling, Scotland, UK. ‐ Tupras İzmir Refinery Metering Skid Project, ‐ Statoil Metering Skids Refinery Project, ‐ Saipem London Metering Skid Project, ‐ Aberdeen Technical University Metering Skid Project,

  • 1 Jahr und 3 Monate, Apr. 2010 - Juni 2011

    Project Manager

    TUPRAS

    ‐ 8000 Nm3 /h Furnace Upgrade Project, ‐ Replacement of old hydro‐cracking reactors and revamping of existing heaters, ‐ H2S stripper column service change, ‐ New HDPE Fire Fighting Line Project ad New Pump Room, Co‐ordinate the efforts of the construction team to meet project requirements.

  • 1 Jahr und 11 Monate, Mai 2008 - März 2010

    Construction Manager

    GAMA Industry Qatar WLL

    Shell Qatar Pearl GTL Project, ($250.000.000), Ras laffan, Al Khor, Qatar, Associated with Linde AG Client Shell Qatar. ‐ Air Separation Units, ‐ Machine House Units and Turbines, ‐ Cold Box, Hex Box and DCC tanks area, ‐ O2 and N2 Tanks Areas, ‐ Reactors,

  • 10 Monate, Aug. 2007 - Mai 2008

    Construction Manager

    GAMA Industry Arabia Ltd.

    Affilitative Company of Gama Industry A.S. located in Saudi Arabia ACC Rabigh Cement Plant Project with 7000 tons/day capacity new clinker line ($150.000.000), Rabigh, Kingdom of Saudi Arabia Client Arabian Cement Company ‐ Rotary Kiln, ‐ Cement Mill, ‐ Clinker Production Unit, ‐ Pre‐ heater Tower, ‐ Natural Gas Pressure Drop station and Pipe Lines, ‐ Cooler, ‐ Raw Mills Unit,

  • 2 Jahre und 3 Monate, Juni 2005 - Aug. 2007

    Construction Manager

    GAMA Industry Arabia Ltd.

    Affiliative Company of Gama industry A.S. located in Saudi Arabia, Yamama Cement Plant Project with 10000 tons/day capacity new clinker line ($190.000.00), Riyadh, Kingdom of Saudi Arabia, Associated with Polysius AG Client Yamama Cement. ‐ Rotary Kiln, ‐ Cement Mill, ‐ Clinker Production Unit, ‐ Pre‐ heater Tower, ‐ Natural Gas Unit and pipe lines, ‐ Tanks Area, ‐ Cooler, ‐ Transfer Tower, ‐ Raw Mill,

  • 1 Jahr und 10 Monate, Sep. 2003 - Juni 2005

    Project Piping Manager

    GAMA Industry Arabia Ltd.

    Berri Gas Plant Project ($210.000.000), ‐ Al Jubail, Kingdom of Saudi Arabia Main Contractor: TECHNIP, CLIENT: Saudi ARAMCO ‐Sleeper Way and Transfer Pipe Line Projects, ‐Knock‐ out drum, filters and flare area with stack, ‐Propane Unit and Utilities Pipe Racks for the plant, ‐Compressor Unit and Chiller Units, ‐SRU Units (2 Units in Revamping and 3 New Units in Segregated Areas) ‐Sweetening System, ‐Storage Tanks and Loading Pumps,

  • 1 Jahr und 1 Monat, Juni 2001 - Juni 2002

    Project Piping Engineer

    ENI‐SAIPEM S.P.A

    Blue Stream Project ‐ Samsun, TURKEY ‐ Preparation of Spools on the Plant, ‐ Installation of the pipes under the Black Sea, ‐ Compressor Station,

  • 1 Jahr und 1 Monat, Juni 2000 - Juni 2001

    Project Engineer

    ASSAN ALUMINIUM

    ‐ Installation of heaters, ‐ Installation of Cooling Tower Preparing Projects Documents Maintenance and repairing of machines and using them in new projects.

Ausbildung von Musa KIRCI

  • 1996 - 2000

    Department of Mechanical Engineering

    YILDIZ Technical University

Sprachen

  • Englisch

    Muttersprache

  • Russisch

    Gut

  • Türkisch

    Muttersprache

21 Mio. XING Mitglieder, von A bis Z