Paul Dickenson

Angestellt, International Project Manager - High Voltage Systems - Ingenieur, ENERCON PLM GmbH

Hamburg, Deutschland

Fähigkeiten und Kenntnisse

Electrical Engineering
SAP
Data Analysis
Root Cause Analysis
Electrical Powering Systems
Power system control
Risk Management
Electrical Planning

Werdegang

Berufserfahrung von Paul Dickenson

  • Bis heute 4 Jahre und 11 Monate, seit Aug. 2019

    International Project Manager - High Voltage Systems - Ingenieur

    ENERCON PLM GmbH

    Ingenieur Hochspannungstechnick

  • 7 Monate, Sep. 2018 - März 2019

    Elektroingenieur Praktikum - Maschine Kraft Kühlung

    DESY

    Key responsibilities: • Root cause failure investigation of failed substation assets • Modeling of primary and secondary power system

  • 6 Monate, März 2018 - Aug. 2018

    Field Engineer

    Tasnetworks

    Key responsibilities: •Monitoring and quantifying risk associated with Electrical infrastructure •Root cause (ICAM) investigation of failed transmission and distribution power systems assets •Technical support for Field Staff, Strategic Assets and Network Operations business units Achievements: •Championing root cause (ICAM) failure investigations •Identification and rectification of latent hazards through analysis of asset failures and data

  • 1 Jahr und 1 Monat, Feb. 2017 - Feb. 2018

    Distribution and Transmission Overhead Lines Asset Engineer

    TasNetworks

    Key responsibilities: •Development of new design standards, for overhead lines and earthing constructions •The development of strategies and support for design staff to understand the limitations of standard designs Achievements: •Introduction of non-destructive testing using an IML Resistograph Micro Drill to wooden distribution poles •Technical evaluation of equipment tender applications • Identifying and rectifying transmission line clearance violations using LiDAR data in PLS-CADD

  • 2 Monate, Jan. 2017 - Feb. 2017

    Graduate Engineer - Asset Engineering - Substations Team

    TasNetworks

    Key responsibilities: •Substation fire prevention and evacuation design •Root cause failure investigation of failed substation assets •Management of proactive substation condition monitoring activities Achievements: •Holistic understanding of substations and fire mitigation systems •Development of substation maintenance program of work

  • 6 Monate, Aug. 2016 - Jan. 2017

    Graduate Engineer - Asset Engineering - Secondary Assets Team

    TasNetworks

    Key responsibilities: •Project manage and develop a technical design for automatic voltage regulator upgrade •Hazard and Operability Study Co-coordinator •Develop recloser settings for non-standard floating earth feeder configurations Achievements: •Holistic understanding of secondary systems •Mature risk management analysis capability •Detailed experience in secondary system design •Extend power system modelling to include secondary systems

  • 6 Monate, Feb. 2016 - Juli 2016

    Graduate Engineer - Asset Performance Team

    TasNetworks

    Key responsibilities: •Project Manager of Service Performance Improvement Framework Project •Analysis of power system performance and communicate results to wider business Achievements: •Establish strong working relationships across a wide range of both technical and non-technical business units within TasNetworks •Development of project management and stakeholder engagement techniques •Increase quantitative analysis skills with big data databases; including geospatial data

  • 6 Monate, Aug. 2015 - Jan. 2016

    Graduate Engineer - Network Planning Team

    TasNetworks

    Key responsibilities: •Undertake options analysis and net present value studies for both distribution and transmission network planning •Providing advice to customers on new motor start, data center connections and solar proposals •Support summer vacation student to develop as a Network Planning Engineer. Achievements: •Comprehensive understanding of options analysis and NPV • Ascertaining and delivering on customerss' needs •Extensive distribution power system modellin

  • 7 Monate, Jan. 2015 - Juli 2015

    Graduate Engineer - Network Performance Team

    TasNetworks

    Key responsibilities: • Development of script calc to maximise output of mini hydro system in distribution network • Review of connection agreement/settings with Hydro Tasmania power stations • Assisting team with automation of PSS/E power system analysis software using python script Achievements: •Extensive transmission and distribution power system modelling inclusive of both static and dynamic models •Developing skills to automate and analysis results of advanced power simulation software

  • 2 Monate, Nov. 2014 - Dez. 2014

    Work Experience - Power Engineering - Hydro Power Station Commissioning

    Hydro Tasmania

    Assisted with commissioning Fisher Hydro Power Station AVR and turbine upgrade.

  • 1 Monat, Sep. 2014 - Sep. 2014

    Work Experience - Power Engineer - Power Station Earthing Commissioning)

    FortEng

    Assisted with commissioning of Herrick (Tasmania, Australia) Mini Hydro Power Station Earthing System

  • 2 Monate, Jan. 2014 - Feb. 2014

    Engineering Vacation Student Placement - Network Development Team

    Aurora Energy

    Undertake options analysis and net present value studies for distribution power network.

  • 3 Monate, Dez. 2013 - Feb. 2014

    Engineering Vacation Student Placement - Ground Mounted Asset Management Team

    Aurora Energy

    Strategic Management of Ground Mounted Electrical Power Infrastructure

Ausbildung von Paul Dickenson

  • 4 Jahre und 11 Monate, Feb. 2010 - Dez. 2014

    Electrical Power Engineering

    University of Tasmania

Sprachen

  • Englisch

    Muttersprache

  • Deutsch

    Gut

  • Spanisch

    Grundlagen

21 Mio. XING Mitglieder, von A bis Z