Peter Kluesener

Angestellt, Design Engineer / Electrical Engineer / Mechatronics Engineer, PACE Engineering

Taree, Australien

Fähigkeiten und Kenntnisse

More than 8 years job experience. Recently with a
Ford Motors
Visteon (which is a spin off of Ford) In England
electrical design of all the interior switches) I

Werdegang

Berufserfahrung von Peter Kluesener

  • Bis heute 15 Jahre und 8 Monate, seit Okt. 2008

    Design Engineer / Electrical Engineer / Mechatronics Engineer

    PACE Engineering

    Design engineer, creating 2D- and 3D-AutoCAD drawings from scratch. This included drawing complete design solutions based only upon a rough guideline of what kind of product is required. Some drawings were designs of plant-earthing. Others detailed product drawings. These 3D designs were the basis for the then following detailed manufacturing drawings, which I drew in compliance with Australian Standards. I also wrote a huge program in VBA which surprised my employer in a positive manner.

  • 1 Jahr und 6 Monate, Mai 2002 - Okt. 2003

    Design Engineer

    Schefenacker in Australien

    Design engineer for automotive switches and lighting products: I worked on the design of new switchgear products and on the improvement of current products in regards of quality, design, manufacturability and costs. In the design department were several engineers working on different switches. After a switch designed by another engineer became a huge liability problem, due to faults nobody else in the company could explain, I was tasked with this problem and quickly found a number of issues with it.

  • 1 Jahr und 1 Monat, Juli 2000 - Juli 2001

    Project Engineer

    Visteon

    I was in charge of the design and supplier selection for the heater blower switch (30A) and heater blower resistors for all Ford-carlines, which is a critical issue as American Engineers making wrong decisions, showed: Due to their wrong decisions, cars in the US went up in flames, while being parked in the garage. As this was such a critical issue, they took me on board for the job. I investigated in detail the connectors and connector coatings.

  • 1 Jahr und 6 Monate, Apr. 1998 - Sep. 1999

    PMST Leader

    Jaguar

    Mayor management responsibility: As PMST Leader I was responsible for he correct electrical design of all interior switches of the Jaguar X-Type. Deciding, what can be used as carry-over from the Ford Mondeo; check of current loads; influencing the Jaguar stylists in the optical design of the switches to reduce the number of different switch versions required and such reducing costs. . I was overlooking all stages of the development of various switches by various suppliers.

  • 9 Monate, Juli 1997 - März 1998

    Project Engineer

    Ford Motor Company

    Project Engineer for electronic CAE simulation (“digital-buck” of the Ford Focus). This involved the simulation of the electronic functions on the computer to find eventual faults long before the design of the actual parts would commence, i.e. this was FMEA in a very early stage during the development process.

  • 4 Monate, März 1997 - Juni 1997

    Engineer

    Ford Motor Company

    As Engineer in the Ford Puma Launch Team I was responsible for the processing of "alerts" and "concerns" (using the programme WERS) and as such it was my role to make sure that each group of engineers working on different components in the final development of the Ford Puma (a sports car) is always up to date with current issues in their field of responsibilities and with issues of other fields playing into their areas as well.

  • 3 Monate, Jan. 1997 - März 1997

    Engineer

    MSX International

    Technical translations (English-German) Receiving CAD computer training (PDGS introduction)

  • 10 Monate, März 1996 - Dez. 1996

    Ingenieur

    Ford Motor Company

    Engineer in fields of product quality assurance. Using the Ford specific program WERS, which is a data-base-program, to generate lists of interest of common faults of selected parts (using information gathered during warranty repairs) for the purpose of improving quality.

  • 11 Monate, Mai 1995 - März 1996

    Project Engineer

    MSX international

    Project engineer for harness (loom) design: It was on me to find the optimal routing of the looms in the Ford Ka during the development phase. This included difficult issues like finding optimal solutions for the wiring around hot-spots in the engine compartments, the prevention of rubbing of looms on other parts, esp. on sharp edges, and the selection of the correct wire diameters to avoid future failures during the lifetime of the car.

  • 6 Jahre und 6 Monate, Okt. 1987 - März 1994

    Mechatronics Engineer

    Technical University of Darmstadt

    Full time university studies (2 years general Electrical Engineering & 4.5 years specialising into Mechatronics, which is a combined degree of Electrical and Mechanical Engineering). This is the normal duration of study for this degree in Germany.

Ausbildung von Peter Kluesener

  • 7 Monate, Nov. 2002 - Mai 2003

    Electrical Engineering

    University of Sydney

    First final year project at the University of Sydney as part of my studies in Germany: “Simulation of a Linear Reluctance Self-Oscillating Motor” by programming a computer simulation in “C++”

  • 16 Jahre und 6 Monate, Okt. 1987 - März 2004

    Electrical Engineering

    THD / TUD Darmstadt, Studienarbeit an der University of Sydney, Australien

    Mechatronics (i.e. = Elektromechanische Konstruktionen). Full time student. This long duration of studies in this field are normal in Germany.

Sprachen

  • Deutsch

    -

  • Englisch

    -

Interessen

Tiny little inventions
which make life easier. After finding the best solution to solve a problem
I simply build the solution (aided by my large collection of special tools). Interest in repairing things.

21 Mio. XING Mitglieder, von A bis Z