Richard Sargeant

is looking for freelance projects. 🔎

Bis 2022, Microsoft Technology Consultant, Allgeier (Schweiz) AG

Altendorf, Schweiz

Fähigkeiten und Kenntnisse

project
contract
30
years
IT
experience
countries
world
implementing
server
client
systems
upgrades
banking
insurance
pharmaceutical
hot-air
balloon
pilot
Lindstrand
Balloons
marketing
advertising
promotion
Microsoft
Windows
2000
2003
Lync
Active directory
trainer
documentation
upgrade
implement
design
architect
migrate
bank
balloons
training
teaching
german
english
Windows 7
Windows 8
Server 2012
Server 2012R2
Server 2008 all versions
XP
Project Management
Group Policy

Werdegang

Berufserfahrung von Richard Sargeant

  • Bis heute 11 Jahre, seit Juni 2013

    Microsoft Active Directory & Lync Systems Specialist

    n/a

    I have just commenced a new project and am not currently considering offers. Thank you!

  • 3 Jahre und 7 Monate, Juni 2019 - Dez. 2022

    Microsoft Technology Consultant

    Allgeier (Schweiz) AG

  • 3 Jahre und 1 Monat, Mai 2016 - Mai 2019

    Senior Consultant

    Alegri AG
  • 7 Monate, Dez. 2012 - Juni 2013

    Microsoft Systems Specialist

    Nyrstar Sales and Marketing

    Architect in charge of implementation of many major new MS technologies into this global organisation. Designed and implemented a new Lync 2013 enterprise infrastructure. This project was successfully completed on time and within budget. • Move of infrastructure to cloud SaaS/IaaS provider, implemented Active Directory Federation Services, Direct Access and a pilot of System Center Operations manager

  • 3 Monate, Sep. 2012 - Nov. 2012

    Microsoft Systems Specialist

    UBS

    • Assisted with migration high-performance mathematical modelling systems Solaris - Microsoft • Sole Microsoft specialist in a team of Unix engineers and developers • Position cancelled at short notice because of UBS corporate budget cuts

  • 11 Monate, Aug. 2011 - Juni 2012

    Active Directory Architect

    Vetroconsult, Bülach

    • Designed and managed migration of all corporate data from Novell to new Microsoft AD • Rationalised Windows 7 build from 6 language variants down to 1 with 6 language packs. • Wrote Group Policies to control W7 GUI languages and keyboards across 6 countries. • Designed DFS structure with Access-based enumeration to accommodate migration from Novell environment • Designed interface between Cisco VoIP system and Vetropack’s AD. • Mentored Novell staff and assisted Vetroconsult IT management

  • 4 Monate, Jan. 2011 - Apr. 2011

    IT Systems Designer, MS Active Directory

    Selecta Management AG

    • IT architect designer in short but complex project to design, document and deliver method of merging the IT systems of DACH into the main body of IT systems of the Selecta Group. Management changes directly affected the delivery of this project but the design and methodology was completed and fully documented. Other significant rectification activities across the whole of the European IT infrastructure.

  • 7 Monate, Juni 2010 - Dez. 2010

    Windows Server 2008 R2 Active Directory Architect

    Major Swiss Electricity company

    • Head architect in complex project to design and document from scratch a new Microsoft Windows Server 2008 R2 AD infrastructure. Design completed December 2010.

  • 1 Jahr und 10 Monate, Mai 2008 - Feb. 2010

    Microsoft Systems Engineer, designer

    IBM

    Microsoft Systems Architect and Designer specialising in new products, Windows Server 2008, Windows 7 and Microsoft Hyper-V. • Co-architect in complex project to split server infrastructure into 2 domains following sale of ABN Amro bank to two different organisations, migration of all servers, users and data. • Designed IBM’s Microsoft Hyper-V virtualization service offering. • Designed and gave 4 internal training courses on Active Directory to IBM engineers.

  • 1 Jahr und 5 Monate, Dez. 2006 - Apr. 2008

    Implementation Manager

    Alcatel-Lucent Schweiz AG

    • Managed a small team (4-6) and project to test new releases of MS set-top box for IPTV, using MERCURY Test Director at Bluewin TV. • Undertook a project to analyse all operational aspects of IPTV and define and author all operational documentation for Alcatel-Lucent's Microsoft IPTV customers, to ITIL principles, including version control, producing all documents to a consistently high-quality standard.

  • 8 Monate, Apr. 2006 - Nov. 2006

    Implementation Engineer

    Alcatel Schweiz AG

    • Selected for this position to implement and support Microsoft's IPTV service for Bluewin and Alcatel IPTV customers. MS IPTV utilises large backend farms of Windows 2003 servers to stream 200+ live television channels to 100'000+ customers. Bluewin product successfully launched in Switzerland November 2006. • Successfully provided 4th line support during installation and ongoing operational support troubleshooting in (80+) server farms liaising with both Microsoft and customers.

  • 11 Monate, Juni 2005 - Apr. 2006

    Systems Engineer/Junior PM

    Zürich Financial Services

    • Selected to handle the design of the global XP client build, following implementation of single global IT infrastructure. Rationalised 2000 applications to 400. • Developed and put in place (previously missing!) processes to manage the rollout of the XP build to 200 offices in Switzerland, managed a small team.

  • 1 Jahr und 1 Monat, Juni 2004 - Juni 2005

    Systems Architect/Junior PM

    Bunge SA., Geneva

    • Appointed to implement a single domain, consolidated IT infrastructure following a host of European acquisitions, for the world’s largest edible oil manufacturer with over 30,000 users. • Developed and put in place systematic processes for the migration of all European subsidiaries, users, servers and data to the new infrastructure. • Chief Technical Active Directory Architect for Europe, successfully designed the Active Directory, Group Policies, DNS, delegation and migration processes for Switzerland,

  • 1 Jahr und 1 Monat, Juni 2003 - Juni 2004

    Systems Engineer/PM

    AIG Private Bank Ltd

    • Led a project team of 4 engineers/packagers. • Managed the project to produce the Active Directory design, and the engineering and design of a Windows XP build for 400 users. Effectively liaised with internal departments and management to deliver and implement OU structure. Authored shell scripts to assist with the data migration during the rollout phase. • Designed single Windows XP client build, ensuring universal configuration to reduce maintenance costs reducing from over 20 builds to 1.

  • 11 Monate, Juli 2002 - Mai 2003

    Systems Engineer

    Novartis Consumer Health

    • Managed the installation and migration of users on all servers throughout Europe for Windows 2000 server/Windows XP client solution project rolled out to 25,000 users. • Successfully migrating users on Windows NT4 based system to the new XP system and effectively liaised with and mentored local teams installing the server infrastructures. • Created scripts to automate migration of user data, liaised with local team to ensure seamless migration.

Ausbildung von Richard Sargeant

  • 6 Jahre und 1 Monat, Jan. 1999 - Jan. 2005

    Information Technology

    Open University, United Kingdom (distance learning)

Sprachen

  • Englisch

    Muttersprache

  • Deutsch

    Fließend

  • Französisch

    Grundlagen

Interessen

Lotus
cars
balloon
hot air
Microsoft
computers
VoIP
travel
marketing
advertising
teaching

21 Mio. XING Mitglieder, von A bis Z