Semih Serdar Kayar

is working from home. 🏡

Bis 2023, Mechanical Completion Engineer, isker

Ankara, Türkei

Fähigkeiten und Kenntnisse

TWI
Plant Inspector Level I
Mechanical Engineering
Mechanics
SolidWorks
Engineering
Construction
Maintenance
CAD

Werdegang

Berufserfahrung von Semih Serdar Kayar

  • Bis heute

    Mechanical Engineering

    ---

  • 3 Jahre und 9 Monate, Juni 2019 - Feb. 2023

    Mechanical Completion Engineer

    isker

    * Tracking Construction status * Handover of each subsystem along with a complete dossier. * Obtaining the Mechanical Completion certificate and conducting a mechanical completion walkdown with the client. * Creating a final list of outstanding items that is agreed upon with the authorized system owner. * Ensuring the completion of outstanding items in coordination with the relevant departments (Construction and Engineering)

  • 5 Jahre und 7 Monate, Dez. 2013 - Juni 2019

    Maintenance Superintendent

    Sumitomo Rubber Europe GmbH

    o Preparation and analysis of Preventive Maintenance Plans with respect to the targets o Managing of Maintenance Budget, Making PDCA to improve o Preparation of Trouble reports and deep analyzing and taking actions, o Performing monthly PM meetings o Root Cause Analysis and Planning Actions related with Breakdowns o Planning and Performing Energy saving activities

  • 1 Jahr und 7 Monate, Juni 2012 - Dez. 2013

    Mechanical Works Site Engineer

    Tekfen İnşaat

    Responsible from mechanical installation works including storage tanks, equipments and piping works.

  • 1 Jahr und 4 Monate, Jan. 2011 - Apr. 2012

    Equipment Erection Superintendent

    Tekfen İnşaat

    Responsible for mechanical installation works and preservation of equipment

  • 2 Jahre, Dez. 2008 - Nov. 2010

    Equipment Installation Superintendent

    Tekfen İnşaat

  • 4 Jahre und 2 Monate, Okt. 2006 - Nov. 2010

    Mechanical Installation Superintendent

    GATE

    Responsible for mechanical installation works and preservation of equipments. This is an Engineering Procurement and Constructing Project of GATE where the main project material supplier is General Electric. This is an expansion for the plant as 3rd Unit. It has 2x42MW Gas Turbine Equipment Erection Superintendent in the Mechanical Works Department. Responsible for installation and testing of static and rotating equipments

  • 2 Jahre und 3 Monate, Okt. 2006 - Dez. 2008

    piping supervisor

    Tekfen İnşaat

    Piping Engineer in the Underground Piping Department. Responsible for fabrication, erection and testing of Carbon Steel and High Density Polyethylene underground piping systems which are fire water and oily water.

  • 1 Jahr und 2 Monate, Mai 2005 - Juni 2006

    Junior Mechanical Engineer

    Temsa A.Ş.

    Bus Assembly line & Design engineer

Ausbildung von Semih Serdar Kayar

  • 5 Jahre und 11 Monate, Okt. 1999 - Aug. 2005

    Mechanical Engineering

    Çukurova Üniversitesi

    PIV,Particle image velocimetry.

Sprachen

  • Englisch

    -

Interessen

Chess
Football
Music..

21 Mio. XING Mitglieder, von A bis Z