Dipl.-Ing. Tiborc Tukács

Angestellt, Powerplant Design, EVN Wärmekraftwerke GmbH

Maria Enzersdorf, Österreich

Fähigkeiten und Kenntnisse

Project Engineering
Power Plant Engineering
Plant Engineering
Design Engineering
International Project Management
Mechanical Engineering
Process Engineering
Power Plant Technology
Power plants
Mechanical Process Engineering
3D CAD
SolidWorks
AutoCAD
2D-CAD
Construction Engineering
Maintenance
Design
SAP
Business engineering

Werdegang

Berufserfahrung von Tiborc Tukács

  • Bis heute 4 Jahre, seit Juni 2020

    Powerplant Design

    EVN Wärmekraftwerke GmbH

  • 2 Jahre, Juni 2018 - Mai 2020

    Mechanical Design Engineer

    EMC

  • 4 Jahre und 5 Monate, Okt. 2013 - Feb. 2018

    Senior Mechanical Engineer / Project Engineer / Consultant

    AUSTROPLAN – Austrian Engineering GmbH

    Project engineering and consultancy with special emphasis on power plant engineering, mechanical and process engineering and consultancy for international cement plant projects. Team member for the design and engineering of cement plant / power plant projects as well as participation on project teams for the elaboration of techno/economic evaluations and studies, tender documentation, etc.

  • 1 Jahr und 8 Monate, März 2012 - Okt. 2013

    Technical Project Manager / Project Engineer

    ATEC - GRECO / Austria

    Project management and project engineering of building material industrial projects in industrial burner systems. - Project management - Project engineering - Internal standardization - Cost estimation and economical evaluation - Developing the process and basic engineering documentation. - Preparation of tender documentation, - Proposal evaluation and supplier selection - 3D/2D CAD design - Coordinating of suppliers - Controlling the budget and time schedule.

  • 1 Jahr und 8 Monate, Aug. 2010 - März 2012

    Senior Technical Expert - Technical Director

    Nabucco Hungary Gas Pipeline Ltd., Budapest/Hungary

    Project management of international gas logistic project technical controlling of project development. Investment cost estimation and evaluation. Controlling and reviewing the basic design of gas transport facilities, pipeline. Coordination of project related ESIA studies. Participation of project related land acquisition procedures.

  • 2 Jahre und 10 Monate, Nov. 2007 - Aug. 2010

    Project Engineer – Design and Engineering Center

    Lafarge Cement GmbH, Vienna/Austria

    Investment projects in cement plant environment up to 20M€ in total. Overall process engineering preparation of Studies with the related Cost Estimation. At the stage of implementation Preparation of Call for Tender, offer evaluation, contractor selection, contracting. Regular site visits to ensure the required technical and safety level. Budget and time schedule control. Start-up, system tests.

  • 2 Jahre und 3 Monate, Sep. 2005 - Nov. 2007

    2D/3D CAD Design Engineer – Mechanical Design, Construction

    Hauni Hungaria LTD. Pécs/Hungary

    2D/3D Mechanical design of tobacco industry equipment. Process equipment, tobacco conveying equipment. Detailed design and documentation (workshop-drawings, parts lists) of belt conveyors, drying, conditioning and saucing machines according to customers’ needs, support the workshop, keep contact with suppliers and our mother company (Hauni Maschinenbau GmbH) in Hamburg/Germany.

  • 1 Jahr und 3 Monate, Juli 2004 - Sep. 2005

    Project Engineer

    Greenergy Ltd, Budapest (Hungary)

    Design and Installations of gas turbine based power plant of 13MWe. As Mechanical Project Engineer I was responsible for coordinating the design and process development works of this combined cycle CHP power plant. Main equipment: - 2 x 6MW Gas Turbine (Centrax KB7) - 1 MW steam turbine (Peter Brotherhood) - Steam and cooling water system - Absorption chillers of 2 MW - 2 MW Absorptionskältemaschinen

  • 2 Jahre und 6 Monate, Feb. 2002 - Juli 2004

    Technology Engineer / Junior Project Manager

    Budapest Power Plant Co. - Budapest (Hungary)

    My responsibilities: process investigation and optimization, I have prepared a study how to adopt the EU CHP Power Generation regulations in the power plants of the group. I took part as junior project engineer in technology modification projects like feasibility study of new oil storage tanks, feasibility study of implementing additional power plant gas boilers and connecting to the existing district heating system.

  • 3 Jahre und 8 Monate, Juli 1998 - Feb. 2002

    Maintenance Engineer

    Pécs Power Plant Co. - Pécs (Hungary)

    My responsibility was to manage the maintenance works of the boiler and steam system of the power plant. - Analyzing the technical status of the system (measures, analysis). - Designing the yearly maintenance plan. - Making the Call for Tender, choosing the suppliers, preparing contracts. - Preparing the time schedule, coordinating and supervise the maintenance works on site. - Responsibility for keeping the budget, time schedules, contractual parameters.

  • 1 Jahr und 11 Monate, Sep. 1996 - Juli 1998

    Maintenance Engineer

    Paks Nuclear Power Plant Co. - Paks (Hungary)

    - Taking part of preparing the maintenance plans for the nuclear reactor system. - Coordinating the site maintenance works of the nuclear reactor system.

Ausbildung von Tiborc Tukács

  • 1 Jahr und 11 Monate, Sep. 1997 - Juli 1999

    Marketing Management

    Janus Pannonius University - Pécs (Hungary)

    Postgraduate marketing engineer studies, in the economic faculty.

  • 2 Jahre und 11 Monate, Sep. 1993 - Juli 1996

    Mechanical Engineering

    Budapest University of Technology and Economics

    Thermodynamics, Material Engineering, Mechanical Engineering, Mechanical Elements, Power Generation Equipment, Water Treatment Chemistry, Nuclear Power Plants, Conventional Power Plants, Power Plant Calculations

Sprachen

  • Englisch

    Fließend

  • Ungarisch

    Muttersprache

  • Deutsch

    Grundlagen

Interessen

Playing Jazz music

21 Mio. XING Mitglieder, von A bis Z