Alireza Hamedbarghi
Angestellt, Logistics and supply Chain Management Specialist, BMW Group
Lichfield, Vereinigtes Königreich
Werdegang
Berufserfahrung von Alireza Hamedbarghi
Bis heute 2 Jahre und 2 Monate, seit Apr. 2022
Logistics and supply Chain Management Specialist
BMW GroupLogistics & Supply Chain Management senior specialist/Consultant in manufacturing companies with international experience such as Renault and experience in the UK automotive companies such as Aston Martin, Stadco (JLR projects) and BMW Group, capable to deliver from A to Z of manufacturing logistics. The current assignments are from BMW manufacturing UK.
3 Jahre und 8 Monate, Jan. 2005 - Aug. 2008
Logistics Manager
Renault Chassis (ACI Pars)
Master Production Scheduling (MPS) Material Requirement Planning (MRP) via SAP Production , inventory and Delivery planning Material flow management Warehouse management Importation and Exportation flow management including documentation , international transportation and customs clearance Monitoring all logistics KPIs Suppliers logistics performance audit according to MMOG/LE
1 Jahr und 9 Monate, Mai 2003 - Jan. 2005
Manager of Planning department
Iran Tire Manufacturing Company
- Demand forecasting and Master Production Scheduling (MPS) - Capacity Requirement Planning (CRP) - Material Requirement Planning (MRP) - Production planning and Inventory control - Engineering Change Management - Industrial Engineering including Time and Method study by “MOST” technique and layout optimization - ISO TS 16949 process documentation on all material flow and contingency plan
1 Jahr und 11 Monate, Mai 2001 - März 2003
Project Manager
Shahid Ghandi Communication Cable Co.
Successfully managed Time study project by “MOST” technique and Capacity study project through sophisticated mathematical programming that achieved 15.3% increase in production lines efficiency
1 Jahr und 11 Monate, Mai 2001 - März 2003
Project Manager
Carton Mashad Packaging Co.
Successfully managed Time and Capacity study project through comprehensive Industrial Engineering tools such as “MOST”, Stop Watch, layout optimization, value analysis and OR modelling
1 Jahr und 11 Monate, Mai 2001 - März 2003
Project Manager
Mega Motor Company (KIA engine and Gear box assembly lines in Iran)
Successfully managed Time study project by “MOST” technique and line balancing project through sophisticated mathematical programming that achieved 20% increase in production lines efficiency
1 Jahr und 11 Monate, Mai 2001 - März 2003
Project Manager
Rayanehbarg Packaging Company
Successfully developed material planning system, warehouse and production layout
3 Jahre und 2 Monate, März 1998 - Apr. 2001
Manager of Department of Industrial Engineering
Iran Carton Company
Implement Material Requirement Planning (MRP) Manage all warehouses of Raw materials, Spare Parts and Consumables subject to space and budget constraints through optimised reorder points Manage Industrial Engineering projects including Statistical Quality Control, Time and Method study by “MOST” technique and Layout optimization Develop and implement Wage Incentive plan based on productivities of production and supporting departments
1 Jahr und 6 Monate, Okt. 1996 - März 1998
Industrial Engineer
Pars Animal Feed Company
Manage Material Requirement Planning (MRP) Develop and implement products formulation optimisation system based on mathematical programming tools
2 Jahre, Sep. 1993 - Aug. 1995
Interim Assignment: Industrial Engineer
Self Employed Freelancer
- Project team member for Time study and design of layout for production facilities at Govah Company (Benz Dumper Truck company in Iran) - Project team member for development and implementation of Preventive Maintenance System at Sadid Heavy Industries Group - Project team member for development and implementation of Quality Control Information System at Sadid Heavy Industries Group
Ausbildung von Alireza Hamedbarghi
1 Jahr und 7 Monate, Sep. 2008 - März 2010
Logistics and Supply Chain Management, MSc
Birmingham City University
Logistics & Supply Chain Performance Measurement in Automotive Sector Using AHP & MMOG/LE Benchmarking
1 Jahr und 8 Monate, Sep. 1993 - Apr. 1995
Industrial Engineering , MSc
Amirkabir University of Technology
Design of models for Chain Sampling Plan (ChSP) when lots of product can be accumulated and its application in a pharmaceutical production unit
5 Jahre und 2 Monate, Feb. 1988 - März 1993
Industrial Engineering, BSc
Amirkabir University of Technology
Statistical Quality Control in Pharmaceutical Companies
Sprachen
Englisch
-
Türkisch
-
Persian
-