Claudia Silva

Praktikum, Consultant MBA Professional Project ENPC-ADP, Aeroport de Paris

Paris, Frankreich

Fähigkeiten und Kenntnisse

MBA
International Business
EMEA
Europe
Global Supply Chain
Project Management
Technology transfer
Healthcare industry
Consumer Company
Marketing Study
Benchmark

Werdegang

Berufserfahrung von Claudia Silva

  • Bis heute 15 Jahre und 5 Monate, seit Jan. 2009

    Consultant MBA Professional Project ENPC-ADP

    Aeroport de Paris

    Internship between Jan 2009 until June 2009 •Provide a market study of current market conditions for the Charles de Gaulle cargo freight operation including but not limited to type of goods imported and exported from and to France; competition and distribution patterns between different transportation methods (e.g. train, road, sea) •Benchmark current Charles de Gaulle cargo operations vs. other logistics centers (e.g. Schipol, Memphis (FedEx), Beijing).

  • 1 Jahr, Okt. 2007 - Sep. 2008

    Global Supply Chain Project Manager

    Johnson and Johnson Animas Corp

    •Responsible for a supplier change for the most critical component of the disposable insulin cartridges. Supplier change provided a cost savings of $2.2 Million USD-project implementation 10 months. •Implemented an aggressive outsource plan for the manufacturing of subassemblies of the insulin pumps. Outsource provided a cost savings of $1.6 Million USD –record project implementation of 5 months •Managed day to day Singapore contract manufacturer activities for the disposable insulin cartridge.

  • 1 Jahr, Okt. 2006 - Sep. 2007

    Business Unit Lead- Disposable supplies:

    Johnson & Johnson Animas Corp

    Managed the implementation for replacement molds utilized in the manufacturing of disposable cartridges for insulin pumps. Fabrication, implementation and transition without interruption of product supply was achieved in record time of 4 months with a cost avoidance of $9,125,000 Lead the implementation of various cost improvement projects at a contract manufacturing facility increasing overall plant capacity; yielding annual cost savings of approximately $500,000.

  • 1 Jahr und 8 Monate, März 2005 - Okt. 2006

    Senior Supply Chain Operations Associate

    Johnson and Johnson McNeil Healthcare

    Developed a supply chain process for a development center located at the McNeil Fort Washington, PA facility. The supply chain process became the model for other deployment-production sites at Puerto Rico and Ireland. Conducted analysis of the current operations of the FW Development site center to determine commercialization feasibility. Assessed process steps that needed improvement to increase productivity and reduce manufacturing downtime.

  • 1 Jahr und 1 Monat, März 2004 - März 2005

    Vendor Management Replenishment-Forecasting Planner

    Johnson & Johnson Sales and Logistics

    Responsible for forecasting and order replenishment of approximately 4000 stock-keeping units (SKU) generating over $65 million in sales annually. Achieved the implementation of supply chain improvements specific to customer – Kmart. Provided reverse distribution savings of $250,000 and Out of Stock yearly Savings of $4,300,000. Led the collaboration of demand/supply issues among planning, customer and sales to ensure product availability and cost savings initiatives.

  • 1 Jahr und 9 Monate, Juli 2002 - März 2004

    Process Project Engineer II- Process Excellence Support

    Johnson and Johnson McNeil Consumer and Specialty Pharma

    •Lead the optimization of Tylenol® Arthritis by reducing 55% of manufacturing cycle time and Improving ergonomic conditions. Project Cost $300000 •Coordinated, implemented and qualified the material charging process to support Tylenol ®8 Hour. Output increment from PV 2.2 to 2.5. Reduction of cycle time 80% in charging and 30% in cleaning.

  • 1 Jahr und 7 Monate, Jan. 2001 - Juli 2002

    Process Project Engineer

    Johnson and Johnson McNeil Consumer

     Assisted the Technology Transfer of Tylenol® Brands from a contract site into McNeil Manufacturing Facilities by providing project management and technical expertise for the FRPII Facilities Rationalization Plan. Project contributed $2 Million in annual cost savings Worked with competing vendors to obtain material, equipment price and performance information. Co-authored and coordinated orders, lead-time and shipment of equipment. Supported the installation, start-up and qualification of equipment.

Ausbildung von Claudia Silva

  • 1 Jahr und 1 Monat, Aug. 2008 - Aug. 2009

    International Business MBA

    Ecole Nationale des Ponts et chaussees

    Concentration in marketing and strategy attending classes in: international business strategy, global supply chain management; marketing management; international trade policy; international financial markets and marketing strategy simulation I and II

  • 1 Monat, Feb. 2008 - Feb. 2008

    Supply Chain Management

    NorthWestern University

    Kellogg School of Management Strategy and Planning for Effective Operations

  • 2 Jahre, Juni 1999 - Mai 2001

    Chemical Engineering

    City University of New York

  • 3 Jahre und 6 Monate, Juli 1994 - Dez. 1997

    Chemical Universidad

    Universidad America

Sprachen

  • Englisch

    Fließend

  • Spanisch

    Muttersprache

  • Französisch

    Grundlagen

  • Italienisch

    Grundlagen

Interessen

Travelling

21 Mio. XING Mitglieder, von A bis Z