Ing. Murat KAVAK
Angestellt, Deputy Project Manager, Renaissance Construction
İstanbul, Türkei
Werdegang
Berufserfahrung von Murat KAVAK
Bis heute 6 Jahre und 7 Monate, seit Dez. 2017
Deputy Project Manager
Renaissance Construction
Tower has 10 basement parking floors, 1 ground and 43 office floors. Coordination of the all reinforced concrete works, finishing works, Façade works with EM works.(Main Items 39.000 ton steel bar, 170.000 m3 C50 & C60 class concrete,500.000 sqm formwork) 75.000 sqm façade works with SAPA system Coordination of the subcontractors Coordination of the all site mobilization works http://www.vakifgyo.com.tr/proje/istanbul-finans-merkezi-projesi
2 Jahre und 2 Monate, Nov. 2015 - Dez. 2017
Site Manager
Renaissance Construction
Shopping Mall has 3 basement parking floors, 5 shopping floors . Coordination of the all reinforced concrete works, finishing works, Façade works with EM works.(Main Items 20000 ton steel bar, 170000 m3 C45 & C50 class concrete, 500.000 sqm formwork) 75000 sqm façade works. (Aluminum, natural stones, precast panels – GFRC systems ) Coordination of the subcontractors Coordination of the all site mobilization works http://rgy.com.tr/tr/projects/hilltown-shopping-center
1 Jahr, Dez. 2014 - Nov. 2015
Site Manager
Renaissance Construction
Coordination of the all reinforced concrete works and finishing works for Office and shopping mall part 1 . (All main items 10000 ton steel bar, 65000 m3 C30 & C50 class concrete,250.000 sqm formwork) Coordination of the subcontractors Coordination of the all site mobilization works http://rgy.com.tr/tr/projects/piazza-mixed-use-project
2 Jahre und 5 Monate, Aug. 2012 - Dez. 2014
Site Manager
Renaissance Construction
RC Tower has 4 basement parking floors, 1 ground and 40 office floors. Coordination of the all reinforced concrete works, finishing works, Façade works with EM works.(Main Items 10000 ton steel bar, 50000 m3 C30 & C50 class concrete,200.000 sqm formwork) 25000 sqm façade works with Schuco system Coordination of the subcontractors http://www.ronesans.com/tr/projects/roenesans-tower
1 Jahr und 11 Monate, Okt. 2010 - Aug. 2012
Construction Chief
Özdilek A.Ş.
Coordination of the all reinforced concrete works.(Main Items 32000 ton steel bar, 150000 m3 C40 & C50 class concrete,500.000 sqm formwork) Coordination of the subcontractors, which are responsible shoring and excavation for the preparing of the site for Construction works. Complex Construction has 2 towers with 40 office floors. (Office and Hotel block) Coordination of the project group Organization of quality control https://www.ozdilekholding.com.tr/
1 Jahr und 4 Monate, Mai 2009 - Aug. 2010
Finishing Works Chief
kayı inşaat
The Serdika Shopping Center and Offices have settled new dimensions and quality standards in Bulgaria. With an area of 186.000 sqm, it has served around 200 high-quality shops and about 33,000 square meters of office space Coordination of the subcontractors on the construction site for the finishing works. http://www.kayi.com.tr/projects/shopping-entertainment-centers/serdika-center
1 Jahr und 1 Monat, Mai 2008 - Mai 2009
Finishing and Rough Structure Chief
Synergy Constuct SRL
As a Finishing Works Chief "The project's theme is "Bucharest Fashion House". The Outlet Center has 36,850 sq m surface area and included 140 store units, 2,700 parking spaces and playground for children. Techno market Project (6500 m2), Coordination of the subcontractors Business development works for the another projects Organization of quality control and hand over processes. http://syncons.eu/portfolio-posts/fashion-house-outlet-center/
2 Jahre und 11 Monate, Juli 2005 - Mai 2008
Finishing and Rough Structure Chief
Yuksel Insaat A.S.
As a Site Chief in the "Jordan Armed Forces, New General Headquarters Complex Project" It was built in west of Amman on an area of 350.000 m2 and has approximately 112.500 m2 of operational area. Within the complex, office areas, social activity areas and management unit areas have been taken place. My responsibility was make control and manage all subcontractors which were working as a structural and finishing works in my buildings and submit the all works to local control engineers.
10 Monate, Okt. 2004 - Juli 2005
Tower Construction Chief - Site Engineer
Deka İnşaat
We were building base station for the new gsm operators(life) except the old ones in Ukraine. Also we were erecting some telecommunication towers to hang some specific antennas on them. My responsibility was make an order of all of towers` production, controlling their qualities, finding new subcontractor to give montage works for erecting. Before the montage works preparing all of necessary documents and report(Soil investigation, static calculation etc..) to make montage and foundation project.
Ausbildung von Murat KAVAK
4 Jahre und 9 Monate, Sep. 1999 - Mai 2004
İnşaat Mühendisliği
İstanbul Teknik Üniversitesi
Üstyapı saha kaba ve ince işler. Altyapı ve yol şantiyesi uygulamaları
Sprachen
Türkisch
Muttersprache
Englisch
Fließend
Russisch
Grundlagen