- Bis heute 12 Jahre und 9 Monate, seit Aug. 2012
Site Manager
ERAN ENGINEERING Co.
Construction of ICDAS Co.Inc. BEKIRLI 600MW THERMAL POWER PLANT BIGA/CANAKKALE/TURKEY
- 1 Jahr, Sep. 2011 - Aug. 2012
PIPING SUPERINTENDENT
TEKFEN CONSTRUCTION & INSTALLATION Co. Inc.
- 1 Jahr, Okt. 2010 - Sep. 2011
SITE MANAGER
INTEKAYSA ENGINEERING Ltd.
- 2 Jahre und 5 Monate, Mai 2008 - Sep. 2010
Piping Lead Supervisor / Superintendent
GAMA QATAR Co. W.L.L.
GAMA QATAR-CTJV(QCS)-QATAR GAS RAS LAFFAN INDUSTRIAL CITY - QATAR Responsible for ; -The fabrication, installation, hydro-testing and reinstatement of Boilers and Utility piping, -Installation, hydro-testing and reinstatement of Vendors’ piping and equipment -Erection of the equipment of Boiler and Utility system. •Lead Mechanical Coordinator during the period of commissioning and handing over job to the client for piping, boilers and technological equipments.
- 7 Monate, Okt. 2007 - Apr. 2008
Deputy Chief
ERAN ENGINEERING Co.
ICDAS Co. Iron & Steel Factory BIGA/CANAKKALE -TURKIYE Responsible for the fabrication, installation, hydro-testing of Utility piping
- 5 Monate, Juni 2007 - Okt. 2007
HVAC Supervisor
GAMA INDUSTRY Co.
OMK Iron & Steel Factory Vyksa, RUSSIA •HVAC / Fire Protection / Plumbing Works Responsible for coordination of subcontractors and construction, hand-over activities regarding HVAC, Fire Protection and Plumbing works for administrative and industrial buildings of the Plant
- 9 Monate, Okt. 2006 - Juni 2007
Site Manager
ERAN ENGINEERING Co.
COLAKOGLU METALURJI Co. Iron & Steel Factory IZMIT \ TURKIYE Responsible for the construction and commissioning of Oxygen Production Facility : -Liquid oxygen tank (1each x 625m3) manufacturing and installation -Gas oxygen tank (10each x 100m3) manufacturing and installation -Cold Box piping installation.
- 3 Jahre und 3 Monate, Aug. 2003 - Okt. 2006
Piping Supervisor
GAMA-TEKFEN-TOKAR ( GTT ) JOINT VENTURE
BABCOCK & MHI & GTT Afsin-Elbistan B Power Plant Project 4x367 MW Afsin-Elbistan-K.MARAS, TURKIYE -The fabrication, installation, hydro-testing and reinstatement of Boilers and Utility piping, -Erection of the equipment of Boilers and Utility system •Lead Mechanical Coordinator during the period of commissioning and handing over job to the client for piping, boiler and technological equipments
- 3 Jahre, Sep. 2000 - Aug. 2003
Piping Supervisor
GAMA AL-MOUSAGGAH INDUSTRY Co.
ALSTOM Shoaiba Power Plant Project ( 5x367 MW ) Jeddah, SAUDI ARABIA -The fabrication, installation, hydro-testing of Desalination Plant, Chlorination Plant and utility piping •Lead Piping Coordinator during the period of commissioning and handing over job to the client for utility, process and boiler piping.
- 1 Jahr und 9 Monate, Juni 1997 - Feb. 1999
Material Handling Supervisor
GAMA INDUSTRY Co.
TRANSELEKTRO Kangal Power Plant Project ( 1x157 MW) Sivas, TURKIYE •Transport and Process Equipment and Material Handling Supervisor
Sprachen
Englisch
-
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.