Navigation überspringen

Mustafa DAMAR

Angestellt, Site Manager, ERAN ENGINEERING Co.
BIGA / CANAKKALE, Türkei

Werdegang

Berufserfahrung von Mustafa DAMAR

  • Bis heute 12 Jahre und 9 Monate, seit Aug. 2012

    Site Manager

    ERAN ENGINEERING Co.

    Construction of ICDAS Co.Inc. BEKIRLI 600MW THERMAL POWER PLANT BIGA/CANAKKALE/TURKEY

  • 1 Jahr, Sep. 2011 - Aug. 2012

    PIPING SUPERINTENDENT

    TEKFEN CONSTRUCTION & INSTALLATION Co. Inc.

  • 1 Jahr, Okt. 2010 - Sep. 2011

    SITE MANAGER

    INTEKAYSA ENGINEERING Ltd.

  • 2 Jahre und 5 Monate, Mai 2008 - Sep. 2010

    Piping Lead Supervisor / Superintendent

    GAMA QATAR Co. W.L.L.

    GAMA QATAR-CTJV(QCS)-QATAR GAS RAS LAFFAN INDUSTRIAL CITY - QATAR Responsible for ; -The fabrication, installation, hydro-testing and reinstatement of Boilers and Utility piping, -Installation, hydro-testing and reinstatement of Vendors’ piping and equipment -Erection of the equipment of Boiler and Utility system. •Lead Mechanical Coordinator during the period of commissioning and handing over job to the client for piping, boilers and technological equipments.

  • 7 Monate, Okt. 2007 - Apr. 2008

    Deputy Chief

    ERAN ENGINEERING Co.

    ICDAS Co. Iron & Steel Factory BIGA/CANAKKALE -TURKIYE Responsible for the fabrication, installation, hydro-testing of Utility piping

  • 5 Monate, Juni 2007 - Okt. 2007

    HVAC Supervisor

    GAMA INDUSTRY Co.

    OMK Iron & Steel Factory Vyksa, RUSSIA •HVAC / Fire Protection / Plumbing Works Responsible for coordination of subcontractors and construction, hand-over activities regarding HVAC, Fire Protection and Plumbing works for administrative and industrial buildings of the Plant

  • 9 Monate, Okt. 2006 - Juni 2007

    Site Manager

    ERAN ENGINEERING Co.

    COLAKOGLU METALURJI Co. Iron & Steel Factory IZMIT \ TURKIYE Responsible for the construction and commissioning of Oxygen Production Facility : -Liquid oxygen tank (1each x 625m3) manufacturing and installation -Gas oxygen tank (10each x 100m3) manufacturing and installation -Cold Box piping installation.

  • 3 Jahre und 3 Monate, Aug. 2003 - Okt. 2006

    Piping Supervisor

    GAMA-TEKFEN-TOKAR ( GTT ) JOINT VENTURE

    BABCOCK & MHI & GTT Afsin-Elbistan B Power Plant Project 4x367 MW Afsin-Elbistan-K.MARAS, TURKIYE -The fabrication, installation, hydro-testing and reinstatement of Boilers and Utility piping, -Erection of the equipment of Boilers and Utility system •Lead Mechanical Coordinator during the period of commissioning and handing over job to the client for piping, boiler and technological equipments

  • 3 Jahre, Sep. 2000 - Aug. 2003

    Piping Supervisor

    GAMA AL-MOUSAGGAH INDUSTRY Co.

    ALSTOM Shoaiba Power Plant Project ( 5x367 MW ) Jeddah, SAUDI ARABIA -The fabrication, installation, hydro-testing of Desalination Plant, Chlorination Plant and utility piping •Lead Piping Coordinator during the period of commissioning and handing over job to the client for utility, process and boiler piping.

  • 1 Jahr und 9 Monate, Juni 1997 - Feb. 1999

    Material Handling Supervisor

    GAMA INDUSTRY Co.

    TRANSELEKTRO Kangal Power Plant Project ( 1x157 MW) Sivas, TURKIYE •Transport and Process Equipment and Material Handling Supervisor

Sprachen

  • Englisch

    -

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z