Dipl.-Ing. Paulo Coelho

Angestellt, Operations Director, CTR

Samora Correia, Portugal

Fähigkeiten und Kenntnisse

Manufacturing Engineering
Industrial Engineering
Manufacturing Strategies
Process Validation
Project Management
Resources Planning
Logistics
Internal and External Audits
Key Performance Indicators
Lean Manufacturing
Production Planning
Process Engineering
Standardization
Production Management
Continuous Improvement
Polyurethane Technology
Budget Controlling
Supply Chain Management
Industrieökonomik

Werdegang

Berufserfahrung von Paulo Coelho

  • Bis heute 4 Jahre und 9 Monate, seit Sep. 2019

    Operations Director

    CTR

  • 1 Jahr und 11 Monate, Juni 2017 - Apr. 2019

    Global DIrector AME Standardization

    Inalfa Roof Systems
  • 4 Jahre und 5 Monate, Jan. 2013 - Mai 2017

    Global Process Engineering

    Webasto Roof & Components SE

    Global technical lead for PUR Encapsulation (25 employees) Europe, Japan, China, America, and Mexico. Responsible for driving standardization and systematization of efficient operating processes for automotive sunroof encapsulation technology across global sites, including Europe, Japan, China, America, and Mexico.

  • 3 Jahre, Jan. 2010 - Dez. 2012

    Manufacturing Engineer

    Webasto Portugal

    Direct lead and responsible for the manufacturing engineering. • Development and implementation of manufacturing strategies • PM for CNC line implementation • Delivered a cost savings of 360.000€ annually through CNC lathe program optimization • Delivered a cost savings of 315.000€ annually through comprehensive refurbishing of existing equipment and tooling development initiatives • Optimized the Gluing Cell Line resulting in a cost savings of 50.000€ annually

  • 2 Jahre und 2 Monate, Nov. 2007 - Dez. 2009

    Process Engineer

    Webasto Portugal

    Responsible for 2 shifts management. • Reduced costs to 290.000€ annually through execution of continuous improvement workshops • Reduced manpower costs by 50.000€ through migration of Batch Production to One Piece Flow at Bush and Rivet Areas • Served as Manufacturing Consultant for the FERRARI California Retractable Top • Executed MTM Analysis, Line Work Balancing, SAP Routings • Developed and executed process monitoring activities, including development of associated reporting

  • 3 Jahre und 3 Monate, Aug. 2004 - Okt. 2007

    Production Supervisor

    Webasto Portugal

    Responsible for integration of the Development and Industrialization teams for the Concept C project. • Recruited and managed Production Operators (40 employees) • Managed and executed production team building and team development initiatives and activities • Executed shift management, start of production, and JIS production activities

  • 1 Jahr und 2 Monate, Juni 2003 - Juli 2004

    Process Engineer

    TAIYO TECHNOLOGY PORTUGAL

    Responsible for process engineering management (plastic injection, painting, laser, pad printing and assembling areas) of multinational OEM plastic parts supplier for Visteon, Pioneer, BMW, Nokia, and Fujitsu. Key Accomplishments: • Successfully kicked off 5S and TPM implementation at Laser area. • Recipient of the ISO TS16949 certification award. • Delivered a cost savings of 500.000€ annually through continuous improvement initiatives and VSM.

  • 1 Jahr und 7 Monate, Sep. 2001 - März 2003

    Production Supervisor

    Faurecia Sistemas Interior

    Served as Production Supervisor of the interior panels’ door, as well as rear and front carpets. • Delivered a cost savings of 40.000€ annually by increasing productivity • Decreased weekly scrap resulting in a cost savings of 30.000€ annually • KPI development, analysis, and review • Collaborated on problem solving and continuous improvement initiatives, leveraging methods that included Hoshin, SMED, TPM, P.D.C.A., 8D, MIFA, 5S, and FMEA • Managed and coordinated operating personnel (30 employees)

  • 8 Monate, Jan. 2001 - Aug. 2001

    Logistics Specialist

    Halla Climate Control

    Responsible for production planning and dispatching spare parts. • Managed and coordinated shipping of finished goods and industrial waste • Performed re-usable packaging administration • Served as the SAP R/3 implementation key user for Production and Sales planning modules

  • 10 Monate, März 2000 - Dez. 2000

    Industrial Engineer

    Halla Climate Control

    Responsible for performing industrial engineering activities for air conditioning shift gears. • Executed all production planning and control activities • Managed and coordinated all cost reduction activities, including budget monitoring

Ausbildung von Paulo Coelho

  • 2012 - 2013

    MSc in Management

    ISCTE-IUL, INDEG BUSINESS SCHOOL

  • 2010 - 2011

    Post-Graduate Project Management

    ISCTE-IUL, INDEG BUSINESS SCHOOL

  • 2003 - 2004

    Post-Graduate Logistics and Distribution

    ISG – SUPERIOR INSTITUTE OF MANAGEMENT

  • 1994 - 2000

    Industrial Production Engineering

    FCT/UNL

Sprachen

  • Portugiesisch

    Muttersprache

  • Englisch

    Fließend

  • Französisch

    Gut

  • Spanisch

    Gut

  • Deutsch

    Grundlagen

21 Mio. XING Mitglieder, von A bis Z