Ing. Sevdalin Nikolov

is available. ✅

Bis 2021, Quality Control Inspector, Neart Na Gaoithe Offshore Wind Farm

Mannheim, Deutschland

Fähigkeiten und Kenntnisse

QA/QC Inspector
QA/ QC Manager
International Welding Engineer
Certified NDT Inspector level 2 in RT (Radiographi
Welding Inspector
Certified NDT Level 3 Ultrasonic Inspector
Certified NDT Inspector level 2 in VT (Visual Test
. Certified NDT Inspector level 2 in MT (Magnetic
Certified NDT Inspector level 2 in PT (Penetrant T
ISO 14001 Internal Auditor ISO 9001 Internal Audi
OHSAS 18001 Internal Auditor
AutoCAD (Advanced Level in 3D)
Ms Office
Tekla Structures-XSTEEL (Intermediate Level)
Navisworks Freedom
Expeditor
Certified NDT Level 2 Phased Array Ultrasonic Insp
ASME B31.3 ASME B31.1
ASME Sec 8 ASME Sec 9
API 650 API 620 API 1104 API 570
ISO 15614
ISO 3834
VCA**
Pressure Equipment Directive PED 2014-68-EU.
EN 13480
EN 13445
EN 12952
EN 1090
CE Marking of the Steel and Aluminium Structures t
Offshore Wind Farms
EN 14015
DNV
ISO 9001 IRCA Certified Lead Auditor
Russian Language
Bulgarian Language
English Language
Turkish language
Construction of Storage Tanks
IWE / EWE
VGB R

Werdegang

Berufserfahrung von Sevdalin Nikolov

  • 6 Monate, März 2023 - Aug. 2023

    QC Leader

    Bladt Industries

    Quality Control Lead Bladt Industries A/S Mar 2023 - Aug 2023 6 mos Satakunta, Finland Project; Coastal Virginia Offshore Wind Farm (CVOW) Fabrication of the Jacketed type Offshore Sub Stations according to DNV OS C401, DNV- ST-0145, AWS D1.1 and Norsok M-101. Review and acceptance of the WPQRs, WPSes, NDT and fabrication procedures. Monitoring and witnessing of the fabrication activities. Managing team of QC inspectors.

  • 5 Monate, Nov. 2020 - März 2021

    Quality Control Inspector

    Neart Na Gaoithe Offshore Wind Farm

    Performing QC inspections in the pipe mill for the fabrication of the Neart Na Gaoithe Offshore Wind Farm structures according to DNV OS C401, DNV-ST-F101 and ISO 10225-1-3.

  • 2 Monate, Okt. 2020 - Nov. 2020

    Lead Site QC and Welding Engineer

    Malarenergi Energy from Waste (EfW) / Waste-to-energy (WtE) power plant

    Vasteras Energy from Waste (EfW) / Waste-to-energy (WtE) power plant. - Replacing old water wall tube panels with the new ones during the maintenance period of the plant. - Managing overall QC activities (Welding, NDT, welding register …etc. ) as a Lead Site QC and Welding Engineer. - Standard in use EN 12952 series and The Pressure Equipment Directive (PED) (2014/68/EU).

  • 10 Monate, Jan. 2020 - Okt. 2020

    Freelance Inspector and Expeditor

    Qatar Petroleum

    Qatar Petroleum ISDN Field Phase 5 Fabrication of the jacketed structures : - Incoming material inspections (including plate inspections at steel mill) , - Cold forming/rolling, monitoring welding parameters, - Visual , Magnetic Particle , Ultrasonic (Automatic and Manual Ultrasonic), Dimensional inspections, - Standards in use ISO 10225-1-3, ISO 10163, API Specification 2B, API RP 2A WSD, ISO 10164 and Shell DEP 37.19.00.30-Gen (ISO 19902).

  • 3 Monate, Okt. 2019 - Dez. 2019

    Lead Auditor and Technical Expert

    Linde Engineering AG

    - Performing Qualification audits on pipes, tubes and fittings suppliers on behalf of the Linde Engineering in various manufacturing paces in Europe. - Qualification audits were performed according to requirements of the ISO 9001, ASME Codes, ISO, EN Standards and Linde Engineering requirements.

  • 6 Monate, Mai 2019 - Okt. 2019

    QC Inspector

    Allseas

    - Quality Inspector for fabrication of the Pipiline End Terminations (PLET) according to Dnv Os F-101, AWS D.1.1, API 1101, API SPEC 6A , API SPEC 17D, API RP 2A and Asme 31.3 - QC activities during the fabrication stage of the sub sea Pipe Line End Termination (PLET), Intermediate Jumper Supports and Tie-ins. - Supervising the preliminary Welding Procedure and Welder Qualifications according AWS D1.1 and ASME B31.3 for FCAW, SMAW, GTAW, GMAW-P, GMAW-STT , SAW and GMAW-C.

  • 4 Monate, Sep. 2018 - Dez. 2018

    Lead Auditor

    TechnipFMC

    Project: Arctic LNG 2, Moscow, Russia. - Performing Second Party Pre-Qualification and Qualification audits (for Emergency Diesel Generators, Flare Systems, Custody Fiscal Transfer Metering System, Heat Exchangers, Columns and Trays and Pressure Vessels) during the FEED phase of the Arctic LNG 2 project in Russian vendors’ premises. - ISO 9001, ASME Codes, European Norms, Customs Unions (TRCU), Client (Novatek) requirements, GOST Standards and project specifications.

  • 1 Jahr und 1 Monat, Aug. 2017 - Aug. 2018

    QA/QC Inspector and Expeditor

    RAV

    - Reviewing ITPs, WPQRs, Fabrication Procedures, and NDT Procedures on behalf of the Clients (TechnipFMC, ExxonMobil and Bureau Veritas). - Visual, Dimensional, Ultrasonic and Corrosion Inspection of steel pipes, plates and sections stored at quayside of the port of Antwerp before shipment to Nigeria.

  • 8 Monate, Aug. 2016 - März 2017

    Production Quality Manager

    DEME Group

    Project: Horns Rev 3 Offshore Wind Farm (49 Numbers of foundations). - Preparation of the Project Quality Manual, As-Built dossier, First Article Inspection, Mock-up Test, Factory Acceptance Test, Site Acceptance test files, NCRs and ITPs. - Factory Inspection and Evaluations of the Fabrication Bidders capabilities according to EN 1090-1-2-3, DNVGL C-401, ISO 9001:2008, ISO 3834. - FEED according to DNVGL OS C 401, EN 1090, ISO 3834, ISO 9001 and Design Briefs.

  • 5 Monate, März 2016 - Juli 2016

    Project Expeditor / Vendor Inspector Gas Combined Cycle Power Plant

    Intertek Inspection Services

    Project 1: Fabrication of the Forced Draft Burners for KMPC Clean Fuel Project, Bulgaria. Project 2: Final Inspection and dispatching all fabricated ducts for Siemens ZCINA SGT400 Project (2x400 Mega Watt Gas Turbines), Bulgaria

  • 6 Monate, Sep. 2015 - Feb. 2016

    QA/QC, Welding Engineer and Coating Inspections

    Parkwind

  • 7 Monate, Okt. 2014 - Apr. 2015

    Welding Engineer

    Technip Italy S.p.A.

    Position: Welding Engineer and Piping QC Inspector. Project: Construction of Heavy Residue H2 Cracking Complex First Phase, Lukoil Neftochim, Burgas.

  • 1 Jahr, Aug. 2013 - Juli 2014

    Welding Engineer

    FLUOR B.V., Netherlands

    Senior Welding and Quality Engineer Project: EPCM services for BASF’s TDI Complex in BASF Ludwigshafen, Germany.

  • 7 Monate, Jan. 2013 - Juli 2013

    Welding and Quality Engineer.

    GEA Air Cooled Systems, Lephalale, South Africa

  • 1 Jahr und 2 Monate, März 2011 - Apr. 2012

    Welding Engineer and Quality Engineer.

    Alstom Power

    Fabrication of Pressure Parts for New Ledvice 660MW Super Critical Boiler in Tlmace, Slovakia.

  • 1 Jahr und 8 Monate, Aug. 2009 - März 2011

    QA/QC Engineer

    AES Cooperation

    Construction of Maritza East 1 Coal Fired Power Plant 2 x 350 MW, Galabovo, Bulgaria

Ausbildung von Sevdalin Nikolov

  • 11 Monate, März 2008 - Jan. 2009

    International Institute of Welding, European and International Welding Engineer

    Sofia Technical University Sofia, Bulgaria

Sprachen

  • Englisch

    Fließend

  • Deutsch

    Grundlagen

  • Türkisch

    Fließend

  • Russisch

    Gut

  • Bulgarian

    -

21 Mio. XING Mitglieder, von A bis Z