Ana Peter-Romero
Bis 2015, Senior Project Engineer for Alaska Small Capital Projects, ConocoPhillips
Opfikon, Schweiz
Werdegang
Berufserfahrung von Ana Peter-Romero
1 Jahr und 7 Monate, Okt. 2018 - Apr. 2020
Project Manager
Phillips 66
provide quality project management support for Phillips 66 Midstream. This includes the full range of project engineering and management support from initial project development through to engineering design, construction and project close out with TIC range between $5MM – 15MM
2 Jahre und 7 Monate, Apr. 2016 - Okt. 2018
The Front End Loading (FEL) Subject Matter Expert (SME) at
Phillips 66
Provides critical Engineering experience and estimating expertise to the FEL group on behalf of Midstream projects. The FEL SME provides valuable insight to FEL Engineers with respect to what types of information, and at what level of detail, is appropriate for budgetary estimates, FEL 1 estimates & AFD requests as well as how to evaluate internal and external resources needed to accomplish the work based on the project size and complexity.
11 Monate, Juni 2015 - Apr. 2016
Sr LNG Process Engineering
Magnolia LNG Ltd
Process Lead responsible of all process documentation, drawings and engineering calculations developed during Detailed Engineering by the EPC contractor KBR SK JV to ensure that design complies with the basic of design, best practices, specifications and government requirements to build an LNG Plant with capacity of 8 MTPO of LNG in Louisiana. Participate in P&ID’s reviews, PHA Studies, Siting Studies, HAZOP, 3D Model Reviews and vendor’s inspections.
2 Jahre und 5 Monate, Jan. 2013 - Mai 2015
Senior Project Engineer for Alaska Small Capital Projects
ConocoPhillips
Provide leadership and management support to the CPAI Project Lead/Manager on projects representing the Capital Projects Organization (CPO) of ConocoPhillips Alaska, Inc. Will collaborate with representatives of other departments and disciplines to execute projects from conception to closure. Be the main technical interface between the Engineering Contractors, CPAI Technical Advisors and CPAI Project Leads.
4 Jahre und 11 Monate, Feb. 2008 - Dez. 2012
Sr LNG Process Engineer, PMP
ConocoPhillips
Provide technical support with Bechtel engineering staff group to perform a variety of studies, FEED, EPC, and technology development initiatives, rated and state simulation ,process design basis development, PFD and P&ID review, process development, equipment datasheet and hazard analysis (SIR, HAZID and HAZOP) participation. Efforts include review of piping design models, hydraulic calculations, technical review of vendor proposals, and vendor acceptance testing. Field support for operating plants.
7 Monate, Juli 2007 - Jan. 2008
Facilities Engineer, SJ BU Farmington, NM
ConocoPhillips
• Provide facility/project technical engineering support to operations as well implementation of strategies. • Continuously monitor and report on the progress of facility project. • Develop infrastructure capital and expense spending profiles for long range planning (LRP.) • Conduct hydraulic and compression studies using F.A.S.T Piper Fekete. Recommend modifications to systems to reduce operating expenses or operating pressures in order to control cost and economically maximize production.
8 Monate, Nov. 2006 - Juni 2007
INFRASTRUCTURE ENGINEER PHASE I COROCORO PROJECT
ConocoPhillips
• Reviewed and agreed on the Basic and Detailed Engineering for the IPF by 4Q-2006. • Provided specific engineering support in all facilities/process/infrastructure engineering functions in value definition between design options to ensure that the process barge facilities are designed and built in accordance with the BU objectives of cost, schedule, and operability. • Identified and resolved critical issues and keep the IPF Project Risk Register updated.
1 Jahr und 1 Monat, Okt. 2005 - Okt. 2006
FACILITIES ENGINEER, DEVELOPING ASSETS TEAM
ConocoPhillips
• Identified, planned, and executed engineering studies required for business planning of the Corocoro Gas and Corocoro Phase II Oil assets, understanding how they would utilize or be integrated with Corocoro Phase I Oil facilities. This position is part of a small multidiscipline team responsible for bringing new projects from the post-exploration stage to the beginning of project execution stage.
1 Jahr und 5 Monate, Mai 2004 - Sep. 2005
Project Engineer
N&V Consultores
Generated conceptual/basic/detail engineering documents of Projects for the National Oil Industry PDVSA, such as: waterproof systems, design of air exchangers for seal refrigeration pumps, steam recovery plant (VCR) for flow station, depressurization and relief gas system in compression plants
4 Jahre und 8 Monate, Juli 1998 - Feb. 2003
Facilities Engineer, Tia Juana Lago BU
PDVSA Petroleos de Venezuela S.A.
• Supervised the operation of Water Injection Plants Systems for the recovery of 9.100 barrels per day, obtaining savings of $200 thousand per year. • Optimized the oil, gas and water network using hydraulic simulators such as Pipephase and Pipesim 2000.Evaluated core process equipment (i.e. pipelines, control valves, pumps, absorption towers) for proper operation of the water and gas injection systems.
Ausbildung von Ana Peter-Romero
1992 - 1998
Chemical Engineering
Universidad Rafael Urdaneta
Sprachen
Englisch
Fließend
Spanisch
Muttersprache
Französisch
Gut
Deutsch
Grundlagen