K M Mostafizur Rahman Sobuj

Angestellt, Production Scheduler, Huber Automotive AG

Abschluss: Master in Management, Technische Universität München

Geislingen an der Steige, Deutschland

Über mich

I am a highly motivated manufacturing engineer with 1 year experience in general assembly of electric vehicle, more than 4 years in material planning, and industrial engineering. I possess a strong understanding of production processes, quality control, and supply chain management. My expertise lies in optimizing manufacturing processes and improving operational efficiency while maintaining a high level of safety and quality.

Fähigkeiten und Kenntnisse

Excel
Materials Requirement Planning (MRP)
Management
MS Office
SAP
5S
Industrial Engineering
Lean Production
Manufacturing engineering
Inventory Control
Demand Management
Kaizen
CAD
VBA
Confluence
Jira
Procurement
DELMIA
Team work
Creativity
Communication Skills
Strategic decision maker
independent
Reliability
Analytical skills
Power Query
SQL

Werdegang

Berufserfahrung von K M Mostafizur Rahman Sobuj

  • Bis heute 1 Jahr, seit Juni 2023

    Production Scheduler

    Huber Automotive AG
  • 11 Monate, Mai 2022 - März 2023

    Manufacturing Engineer

    Sono Motors GmbH

    • Operational collaboration and identification of technical problems during manufacturing. • Validation and improvement of the vehicle assembly sequence for the series production. Achievements: a. Worked with cross-functional R&D team to unify the torque values for various fasteners. 78% reduction of variation. b. Created MBOM using Manufacturing Items Engineer in 3DX for virtual build evaluation. 10% improvement in overall productivity.

  • 3 Jahre und 5 Monate, Dez. 2015 - Apr. 2019

    Material planning coordinator

    Walton Micro-Tech Corporation

    1. Plan raw material demand to maintain optimal inventory levels and smooth operations. 2. Implement process improvements and automation initiatives to enhance efficiency of logistics operation. Achievements: a. Purchase requirements analysis tool in Excel using VBA that connects with ERP system, a 40% improvement in planning accuracy. b. Developed framework for vehicle scheduling and logistics automation, a 30% decrease in vehicle idle time.

  • 1 Jahr und 6 Monate, Sep. 2013 - Feb. 2015

    Industrial Engineer

    Utah Knitting & Dyeing Ltd.

    1. Analyze and improve the workflow of the production process using work study, time and motion studies, and line balancing to determine the most efficient way of doing operation. Achievements: a. Developed 30+ standard operating procedures and conducted safety awareness training. 15% increase in productivity and a 25% reduction in employee turnover rates. b. Developed an MS excel based sewing operation bulletin tool to identifiy bottleneck. 20% increase in productivity.

Ausbildung von K M Mostafizur Rahman Sobuj

  • 3 Jahre und 3 Monate, Okt. 2020 - Dez. 2023

    Management

    Technische Universität München

  • Bis heute 3 Jahre und 8 Monate, seit Okt. 2020

    Management

    Technical University of Munich

    A comprehensive curriculum aimed to provide advanced management and leadership knowledge and abilities. The program stresses strategic thinking, decision-making, and problem-solving abilities, as well as a solid foundation in finance, marketing, and operations.

  • 4 Jahre und 8 Monate, Sep. 2008 - Apr. 2013

    Industrial and Production Engineering

    Shahjalal University of Science and Technology

    Learned to analyze, design, implement the optimization of complex processes, systems, or business to eliminate waste of time, money, materials, man-hours, machine time, energy and other resources that do not generate value.

Sprachen

  • Englisch

    Fließend

  • Deutsch

    Grundlagen

Interessen

Cooking
Cycling
Voluntary work
Renewable Energy

21 Mio. XING Mitglieder, von A bis Z