Ricardo Oliveira
Freiberuflich, Construction Superintendent, 3M DACH
Antwerpen, Belgien
Werdegang
Berufserfahrung von Ricardo Oliveira
Field construction support for the EPC work package leaders of the mechanical & piping work. Verify in the field if the construction is executed according to the mechanical & piping RFC packages. Perform walk downs and create punch lists. Act as connection between construction management, contractors and work package leaders. Diagnose problems if they occur and propose/discuss solutions with work package leaders. Assist in the follow-up of safety procedures during construction activities.
2 Jahre und 5 Monate, Nov. 2018 - März 2021
Construction Manager
Fluor Corporation
Coordinated all aspects of manufacturing scheduling, production. Oversaw construction of Carbon Steel, Stainless Steel. Oversaw scheduling and manufacturing processes; managed subcontractors in preparation, and construction. Cross-checked documentation; inspected work on site to assure compliance with ASME standards. Pneumatic Test; Insulation. Identified and corrected construction issues. Documented deviances from standard procedures; implemented corrective measures.
1 Jahr und 4 Monate, Aug. 2017 - Nov. 2018
Piping Superintendent
Fluor Corporation
Modular manufacturing, construction facility. Oversaw scheduling and manufacturing processes; managed subcontractors in preparation, welding and construction. Inspected work on site to assure compliance with ASME standards. Directed subcontractors in activities including welding and construction, Hydro test, Steam trace, Pneumatic Test; Insulation. Identified and corrected manufacturing and construction issues. Implemented corrective measures. Manage Construction subcontractors
10 Monate, Okt. 2016 - Juli 2017
Senior Mechanical & Welding Supervisor
Duro Felguera, S.A.
Oversaw construction of Carbon Steel, 9% Nickel, LNG Plant, manufacturing facility. Oversaw scheduling and manufacturing processes. Managed subcontractors in preparation, welding and construction. Cross-checked documentation; inspected work on site to assure compliance with EN & Asme quality standards. Managed team of 40 welders. Directed subcontractors in activities including welding and construction; assured quality control of all work and materials
11 Monate, Nov. 2015 - Sep. 2016
Pipe Welding Superintendent
Fluor Corporation
Coordinated all aspects of manufacturing scheduling, production. Oversaw construction of Carbon Steel, Stainless Steel. Modular manufacturing, construction facility. Oversaw scheduling and manufacturing processes; managed subcontractors in preparation, welding and construction. Cross-checked documentation; inspected work on site to assure compliance with ASME standards. Directed subcontractors in activities including welding and construction, Hydro test, Steam trace, Pneumatic Test; Insulation.
11 Monate, Jan. 2015 - Nov. 2015
QC Welding Supervisor
Entrepose
LNG Gas Condensate Field - Erection 4 LNG tanks of 160.000m3. Senior Welding Supervisor: Oversaw construction of Carbon Steel, 9% Nickel, LNG Plant, manufacturing facility. Oversaw scheduling and manufacturing processes; managed subcontractors in preparation, welding and construction. Cross-checked documentation; inspected work on site to assure compliance with GHOST and Russian quality standards.
2 Jahre, Jan. 2013 - Dez. 2014
QC Supervisor
Siemens VAI Metals Technologies GmbH
Documentation and manufacturing process of power plants,plants and steel plants, in the category groups pressure parts, steel and steel plate construction and machine parts Visual inspection during manufacturing of numerous various components Final Inspection/ confirmation of manufactured components incl. QA documentation Monitoring of all manufacturing steps from receiving materials to shipment Daily status reports for quality and process to the client Weekly progress reports
Coordinated all aspects of manufacturing, scheduling, production, and construction for steel manufacturing plants in Brazil and Germany, as well as construction of new blast furnace. Directed subcontractors in activities including welding and construction; assured quality control of all work and materials. Managed logistics and materials sourcing; identified and corrected manufacturing and construction issues. Managed stakeholder relations.
1 Jahr, Dez. 2010 - Nov. 2011
Senior Piping Superintendent
HuDe GmbH
Directed contractor teams in managing, prefabricating, pickling, and constructing prefabricated stainless steel piping for Egyptian ammonia and urea production facility. Coordinated with stainless steel task force manager, company owner, and inspectors; managed preparation, pickling, and cleaning of stainless steel materials. Reviewed quality control assessments;
Ausbildung von Ricardo Oliveira
- Bis heute
Mechanics
Secondary School
Sprachen
Englisch
Fließend
Portugiesisch
Fließend
Spanisch
Fließend