Burak BAGCI
Bis 2023, E&I Site Engineer, Renaissance Heavy Industry
Istanbul, Türkei
Über mich
• Total 13 Years of experiences on E&I Works. • 10 Years of experiences overseas on various projects. • Project implementation, supervision, material control and installation. • Expert level in AutoCad and MS Excel. • Installation & as-built & design & details drawing projects in all electrical systems. • Highly motivated individual, who is capable of working to deadlines and have organizational and communicational skills. • Experienced in 6,6kV & 11kV & 30kV cable installation and termination. • Experienced in optical fiber field installation, junctions and terminations. • Experienced in fire detection systems field installation and terminations. • Experienced in CCTV systems field installation and terminations. • Experienced in data-network systems field installation and terminations. • Lighting & Power, LV & HV electrical system installation, testing and pre-commissioning. • Experience of working and mentoring a multi-cultural team.
Werdegang
Berufserfahrung von Burak BAGCI
1 Jahr, Mai 2022 - Apr. 2023
E&I Site Engineer
Renaissance Heavy Industry
METALLURGICAL HOT STRIP MILL PLANT • Total 970 MVA Electrical Power Installation, including Overhead Power Line Total 36 pcs Electrical Power Transformer Installation
1 Jahr und 3 Monate, Jan. 2021 - März 2022
Head of Electrical Engineering
Renaissance Heavy Industry
• Surveying and checking the client’s drawing. • Clarification of the mistaken points of the client’s drawings. • Preparation of the procurement list as per the client's drawings. • All necessary conversation with the procurement department and the suppliers according to the technical requirements of client. • Checking and interfering to the site installations of the electrical discipline according to the technical and qualifiable requirements with client's responsible. • Punch clearance and walkdowns.
3 Jahre und 10 Monate, Juni 2018 - März 2022
E&I Engineer
Renaissance Heavy Industry
• Preparation of E&I shop drawings, as-built and detail installation drawings. • Preparation of the Redline drawings according to field installations. • Follow up and site management on all electrical site activities. • Electrical QC Works, site inspections as per ITPs and Specs. • E&I Commissioning Activities. • E&I Hand Over and Start-Up Activities. • Responsible Site Manager of the all departments for the Warranty Period of two years.
1 Jahr und 4 Monate, Nov. 2016 - Feb. 2018
Commissioning & Startup - Handover Technician
Bechtel-ENKA
• Engineering Works & Installation Tracking on site activities. • Follow up the Progress of Electrical disciplines. • Daily progress reports’ preparation. • I&E / I&C documents' preparation of as-built and detail drawings. • Preparation of handover dossiers and relevant documentation. • Preparation of Redline drawings according to field installations. • Walkdown Report and Inspection Request (IR) dossiers’ preparation.
1 Jahr, Nov. 2015 - Okt. 2016
Electrical Engineering Technician
kayı inşaat
• Engineering Works & Installation Tracking on site activities • Follow up the Progress of Electrical disciplines • Preparation work schedules of electrical works • Preparation on progress reports and relevant progress payment report • Electrical QC Works, site inspections as per ITPs and Specs. • Preparation of cost estimation for change orders and variation orders • Inspecting and approving contractors' deliveries of materials, all in accordance with standards, technical requirements and approved drawings
2 Jahre und 2 Monate, Okt. 2013 - Nov. 2015
Electrical Design Engineer
Arma Elektropanc - Imtech
• Transformer Plants & Generator Systems • Solar Energy Back-up System • Compensation and Harmonic Filters • Medium Voltage Power Distribution • Low Voltage Power Distribution • Grounding and Lightning Protection System • Internal - External and Emergency Lighting System • Lighting Control and Dimmer System • Electrical Panel Details / Motor Control Panels Details • Building Automation and Energy Management System • MV, LV Short Circuit & Power Calculations • Cable Tray Calculation & Installation Details
9 Monate, Feb. 2013 - Okt. 2013
Electrical Design Engineer
positive design office
• Transformer Plants & Generator Systems • Low Voltage & Medium Voltage Power Distribution • Internal - External and Emergency Lighting System • Lighting Control and Dimmer System • Fire Alarm & Emergency Announcement & Public Announcement System • Security (CCTV, Card Access Control, Intrusion Alarm System) • Telecommunication System & Data Network • Lightning Protection System • Cable Tray Calculation & Installation Details • Electrical & Technical Rooms Detail Drawings
Sprachen
Englisch
-
Französisch
-
Arabisch
-
Russisch
-
Türkisch
-