Dipl.-Ing. Dan Aurel Zanfir

Angestellt, Turnaround Coordinator by TDI-BASF - Ludwigshafen, BASF - We create chemistry

Ludwigshafen am Rhein, Deutschland

Fähigkeiten und Kenntnisse

Team leader
professional skills
experienced mechanical and piping
managment
fluent in English
interested in completing the activities
planning good understanding
erection
field engineering modification
testing
completion
pre-commissioning
commissioning
System

Werdegang

Berufserfahrung von Dan Aurel Zanfir

  • Bis heute 3 Jahre und 2 Monate, seit Apr. 2021

    Turnaround Coordinator by TDI-BASF - Ludwigshafen

    BASF - We create chemistry

    After few years in different companies on the BASF -Ludwigshafen platform covering also positions related with the site management, I am now since 2020 active part in the Turnaround Management Team for the TDI-BASF plant as Mechanical&Piping Turnaround Coordinator looking to cover the preparation and conducting the Shutdown activities especially for the HCL segment of this TDI, one of the biggest engineering development in BASF Ludwigshafen.

  • 1 Jahr und 3 Monate, Jan. 2020 - März 2021

    Turnaround Coordinator

    iks Engineering GmbH
  • 4 Monate, Sep. 2019 - Dez. 2019

    Bauleiter

    Weber Unternehmensgruppe GmbH & Co. KG

    Ich habe 2019 Abstellung BASF-Chlor Fabrik als Mitglied von Weber Site Management Team durchgeführt

  • 9 Monate, Jan. 2019 - Sep. 2019

    Bauleiter

    HS - Rohrleitungsbau

    Ich habe die HS -Rohrleitungsbau Montage Aktivitäten von BASF-Rohrbrüchen Leitung durchgeführt

  • 4 Monate, Aug. 2018 - Nov. 2018

    Bauleiter

    Hertel Industrie Service GmbH - MAWI GmbH

  • 7 Monate, Jan. 2018 - Juli 2018

    Bauleiter

    Gemont Deutschland GmbH, BASF Ludwigshafen

  • 1 Jahr und 2 Monate, Dez. 2016 - Jan. 2018

    Bauleiter

    VHP Bautechnik GmbH & Co. KG, 68519 Viernheim

  • 4 Monate, Aug. 2016 - Nov. 2016

    Maintenance Coordinator

    EGTL 1 - Chevron Nigeria Limited

  • 3 Monate, Nov. 2015 - Jan. 2016

    Anlageningenieur

    Ekoplan-Invest Gmbh - Mannheim

  • 9 Monate, Jan. 2015 - Sep. 2015

    Mechanical Engineer

    Chevron, Chuandongbei Gas Project, Namba, China

  • 1 Jahr, Juni 2013 - Mai 2014

    Construction Engineer

    Chevron, Escarvos, Nigeria

    As ASU/Utilities Superintendent I am looking to complete all last activities renaming not done (construction, testing, per-commissioning, completion, start-up)after the sub-contrarcator close all parts as per contract.

  • 1 Jahr und 6 Monate, Jan. 2012 - Juni 2013

    Mechanical Construction Manager

    Techint Cimimontubi , Escravos –Nigeria

    Coordinating completion of final stages for ASU (Air Separation Unit) systems from sub-contractor, Techint Cimimontubi side. This actions referring to completing mechanical activities for equipments and piping lines, as systems TP’s (test packages) following by closing after test the required Post Testing Punch Item Lists for each system and pre-commissioning activities in order to conduct these to Mechanical Completion (MC) and Ready for Commissioning (RFC) stages.

  • 2 Monate, Aug. 2011 - Sep. 2011

    Maintenance Mechanical Trainer, Piping & Equipment’s

    FISIA ITALIMPIANTI- Dubai Energy &Water Authority (DEWA), Dubai City

    In this organization I was responsible with implementing these Mechanical Trainings, Piping and Equipment’s to DEWA Maintenance Team. This activity was done during 4 weeks in which ones I was preparing the Power Point representation of these courses using the Construction documentation and Operation Manual of this station and directly teaching this Mechanical Maintenance team based upon these courses.

  • 2 Jahre und 3 Monate, Mai 2009 - Juli 2011

    Construction Mechanical Piping Engineer

    MAN SE Germany in HUBCO Power Plant, Narowal-Lahore, PAKISTAN

    Cooler Area (Radiators), Unloading Station, Tank Farm, Fuel Pump House and Power House Building, piping and supports erection activities done by the mechanical subcontractor, EKL – Pakistan, for connecting 11 pcs. MAN engines and 1 pcs. Dresser turbine with the support systems (HFO- Heavy Fuel Oil, Diesel Oil, Lube Oil, Steam Generation, Water Supply, Charge Air Cooling Water, Engine Cooling Water, Blow Down, Working Air)

  • 11 Monate, Mai 2008 - März 2009

    Main Contractor Mechanical Superintendent

    Technip Italy in KGP Gas Plant Khursanyah, Saudi Arabia

    Sulphur Storage and Loading Area (since 3 months) covering supervision activities in the Sulphur Jacketed Lines Systems and Auxiliary Systems follows piping and supports erection as Test Pack’s completions.Covering the Flare and Off Site Knock Out Drum Chemical Storage Area with main duties to coordinate piping and supports activities of Main Steam System and Blow Down System, activities that are done by Consolidated Contractors Company (CCC) under my supervision

  • 1 Jahr und 5 Monate, Sep. 2006 - Jan. 2008

    Site Construction Superintendent

    Consolidated Contractors International Company , Ras Laffan, Qatar

    Utility Area with main duties for erection of six boilers (355 t, 63 bar, 440 degree Celsius) fabricated by MACCHI TM a division of “SOFINTER” S.p.A. Italy. Piping erection for Air Compressors “KOBELCO KOBE STEEL. LTD” (suction pipe and cooling lines), Boiler Feed Water Pumps “NUOVO PIGNONE BARI” (oil system; control oil, oil supply, oil return oil discharge, oil suction), Carbon Filter Package Train “UNIDRO S.p.A (lube oil system).

  • 2 Jahre und 1 Monat, Sep. 2004 - Sep. 2006

    Mechanical Engineering Coordinator

    Nuclear Power Plant Unit 1 CNE-PROD, Cernavoda, Romania

    Working in an engineering team (“Fix it now”) who was supporting Operational party in a predictive way with recording date directly from field (sketches and measurements) for situations rise by them which could became nonconformance with good functions of nuclear piping system in Cernavoda Unit 1 Nuclear Power Plant .

  • 3 Jahre und 6 Monate, März 2001 - Aug. 2004

    Site Mechanical Engineer

    Nuclear Power Plant Unit 2 CNE-PROD, Cernavoda, Romania

    Leading worker teams in a professional manner following to respect quality and schedule requirement and a good safety level (weekly technical commissions followings indicated procedures complete approved by Management Team – SNN –AECL - ANSALDO).

Ausbildung von Dan Aurel Zanfir

  • 5 Jahre, Aug. 1995 - Juli 2000

    Mechanical Engineering

    Polytechnic University Iasi, Romania

    site erection, equipments, piping, testing,materials, calculation, design, inspection

Sprachen

  • Englisch

    Fließend

  • Deutsch

    Grundlagen

  • Italienisch

    Grundlagen

Interessen

playing football
listen music
spending time with my kids

21 Mio. XING Mitglieder, von A bis Z